The Royal Saudi Navy appointed “ARE” to carry out the investigation, assessment, recommendations, and detailed design check, under water survey, structural analysis, rehabilitation design, and tender documents for the restoration of the Ship Repair Facilities (SRF) at KFNB in Jeddah.
The Scope of Works involved visual inspection above and under water, site sampling & testing, assessment of & recommendations for the rehabilitation works. Apart from concrete elements (piles, pile caps, beams, pre-stressed deck slabs, etc.), all utilities and M & E installations were included in the scope, as was the structural analysis of the piers and wharves, the design check for the Synchro Ship Lift.. The job involved experts from our Associate Company, COWI (Denmark) and Synchro Lift (USA).