“ARE” COWI was invited to do the investigation, assessment and diagnosis for deteriorating concrete structures of certain concrete structures in Al-Khobar Desalination Plant.
The structures inspected were the intakes, collection basins, pump houses, Chlorination building, sea walls, Gantry Crane, siphon basins and channels. The work involved extensive sampling and testing. “ARE” COWI after investigation prepared the recommendation report and also the tender documents for repairs of the structures.
