“ARE” were appointed for the investigation and assessment of certain concrete structures at the Shoaiba Desalination Plant (Phase 1) including the Turbine Area, Boiler Area, Chlorination Building, Tank- and Jetty Area, storm water- and collection channels, cable ducts, the evaporator slabs, and other works.
In addition to the above ARE have been requested to prepare the Detailed Design and Tender Package and carry out the Site Supervision of the rehabilitation works.