SWCC, appointed “ARE” to prepare technical studies and repair specifications of the structures. Scope includes: concrete tanks for Riyadh Water System (used for Operational / storage / fire system); Drain Valve Chambers, etc. “ARE” has to prepare documentation which incl. Scope of Works; Tender Drawings; Bills of Quantities; Performance Specification for the monitoring scheme; and Specification for any addition rehabilitation or remedial works.
