The Saline Water Conversion Corporation ( intends to design, construct and operate a new desalination plant based on Seawater Reverse Osmosis SWRO) process and produce a total net production capacity of 1 000 000 m 3 /day at Al Jubail Kingdom of Saudi Arabia.

SMC, a consortium of Saudi Services for Electro Mechanical Works Co ..(SSEM and Metito have been awarded a contract to provide engineering design and construction works for the Al Jubail Desalination Plant Phase 2 Project.

Alrabiah Consulting Engineers, an independent specialist risk management consultancy has been contracted by SMC to facilitate and record the Hazard and Operability ( study for the project.

The objectives of the HAZOP workshop was to systematically identify and analyze hazards and operability issues associated with the design of Al Jubail Desalination Plant Phase 2 Project.

The scope of HAZOP was limited to the P&IDs for the detailed design phase of Al Jubail Desalination Plant Phase 2 Project