Sl No Project Description
Note: This is a selected project list, for more projects references you can request by clicking contact us.
Country / Location / Year / Client / Project Value (of Alrabiah)
1 Traffic Engineering Review and Consultation

The scope of services included the following.

  • Review the provided scope of work document to identify the specific objectives and deliverables.
  • Confirm the applicable codes, standards, and best practices (e.g., codes, traffic design guidelines, safety standards, etc.)
  • Develop and simulate traffic scenarios to assess the impact of the proposed new road under varying conditions.
  • Assess the current signage system at the gas station’s entry and exit points.

Propose new or modified signage, if required to optimize traffic flow and ensure safety under both existing and proposed scenarios.

Saudi Arabia

KSA – Rabigh
2025
KAUST
Project Value: Confidential
Duration: 2 months

2 RAM Study for East Region Manufacturing

ARE were awarded by Saudi Aramco, to provide professional services pertaining to east region manufacturing facilities which include Jumayiah (JNGLFD), Ras Tanura Refinery (RTR) & Riyadh Refinery Department (RRD). The RAM study for ERM facilities shall include the following:

  • ERM RAM Study Kick of Meeting
  • ERM individual RAM model operation review with operational failures and consequence analysis for individual facilities.
  • Developing the individual RAM models for each of ERM processing facilities, review and validation of the prepared individual models.
  • Developing the integrated RAM models for all of ERM operating facilities, review and validation of the prepared integrated models.
  • Performing up-to 8 sensitivity analysis cases for each final individual model of the ERM operating facility.
  • Performing up-to 30 sensitivity analysis cases for ERM Integrated RAM model.
  • ERM integrated RAM model shall integrate all ERM processing facilities. Individual RAM models under one integrated model, and shall analyse ERM end products production deliverability to the end-users.
  • RAM models shall have a provision for additional future expansions and/or new facilities without the need to change the existing layout of ERM.
  • ERM RAM Study Report, including individual and Integrated RAM models.
Saudi Arabia

Various ARAMCO Facilities, KSA
2025 – 2026
Saudi ARAMCO
Project Value: Confidential
Duration: 12 Months

3 Various Projects of Ministry of Health in Hafr Al Batin, Site Supervision

The Directorate of Health Affairs in Hafar Al-Batin appointed “ARE” to provide services for the supervision of various projects in different towns/villages in the Hafr Al Batin region. The works mainly involve supervising whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, inspection of all activities on site, approval of materials, etc. The works also include all disciplines viz. civil, mechanical, piping, landscaping, plumbing, electrical utilities, architectural, etc.

Saudi Arabia

KSA-Hafr Al Batin
2025 – 2027
Directorate of Health Affairs in Hafar Al-Batin
Project Value: SR. 4.985,800
Duration: 24 months

4 Al Babtain Office Building, Khobar

Abdul Latif al Babtain Trading & Contracting Co. appointed “ARE” to prepare IFC design package for the construction of their office building, in Khobar.

The building comprised of twelve (12) floors office building in addition to eight (8) floor parking. The office building basically includes all facilities for staff, administration, swimming pool, training facilities, etc. The work involved detailed design and preparation of IFC package to invite potential bidders for the construction of the facility. The works included all disciplines viz. civil, landscaping, plumbing, sanitary, HVAC, FFS, FAS, electrical, etc. Traffic study for the project was also done.

Saudi Arabia

KSA – Al Khobar
2025
Abdul Latif Al Babtain, Khobar
Project Value: SR. 2,750,000
Duration: 6 months

5 Integrity RAM Study of PD & T Facilities

ARE were awarded by Saudi Aramco, to provide professional services pertaining to Northern Area Pipeline Department, Southern Area Pipeline Department, East West Area Pipeline Department, Western Region Dist. Department in KSA. The objective of the project is to identify critical points during the operation phase and to suggest if necessary remedial actions in order to increase the availability. The detailed failure mode, effects and criticality analysis is suitable approach on equipment spare parts, documentation, maintenance procedures and related logistic arrangements. Control systems, equipment, rotating equipment (including their associated auxiliary components) shall be analysed (considering acceptable probability rate) to ensure that the reliability of the facility is not adversely impacted by the failure consequence of a given type of failure shall be an important factor for such an analysis. The RAM Study as a minimum shall identify:

  • Optimum design configuration for each Design Case sensitivity with associated cost, where possible.
  • Identification of areas for improvement with recommendations to mitigate issues.
  • Sparing Philosophy.
  • Maintenance strategy for Predictive, preventative and breakdown maintenance.
  • Risk and criticality assessments.
Saudi Arabia

KSA – Various ARAMCO Facilities
2024 – 2026
Saudi ARAMCO
Project Value: Confidential
Duration: 3 years

6 Contract # HQ134AGOC-4 – General Engineering, Consultancy and Supervision Services

The ARAMCO Gulf Operations Co. (AGOC), appointed “ARE” to provide Engineering, Design Services, Project Management and Construction Supervision as part of AGOC’s overall engineering and project management program. The activities include to perform design and other engineering related services as directed, from time to time in written Service Orders, by AGOC. Such Services include a variety of engineering works related to both Industrial and non-industrial projects, depending upon AGOC requirements. AGOC seeks the services from ARE under the areas of the following engineering and project related phases but not limited to:

  • Development of Scope of Work, Conceptual & Feasibility Studies
  • Front End Engineering Design (FEED)
  • Detail engineering design including the preparation of tender packages
  • Construction Supervision
  • Project Management
  • Safety Studies such as HAZID, HAZOP, SIL, QRA, Risk Management & CFD, etc.
Saudi Arabia

KSA – Khafji
2024 – 2029
ARAMCO Gulf Operations Co. (AGOC), Khafji
Project Value: Undefined
Duration: 5 years

7 Technical Support Services for Customization Management

National Water Company (NWC), appointed ARE to provide specialized team to support the Customization Directorate in NWC in the field of planning, development and supervise the performance contracts of customization projects. The Project Customization Contracts include the Management Contracts, Long Term Operation and Maintenance Contracts for existing Water Treatment Plants, and ISTP Contracts. The purpose of the team is to assist NWC achieve the Water Strategy 2030, which has been developed, and includes five strategic objectives:

  • Ensure continuous access to sufficient quantities of potable water, at normal times and during emergencies.
  • Enhancing the management of water demand in all uses.
  • Provide cost-effective, high-quality water and wastewater services, taking into account affordability.
  • Protecting water resources and optimal use of them, while preserving the local environment to achieve the highest benefit for Saudi society in this generation and in the future.

Ensuring the competitiveness of the water sector and its positive contribution to the national economy by promoting effective governance, private sector participation, and localization of capabilities and innovation.

Saudi Arabia

NWC – Riyadh
2024 – 2027
NWC H.O., Riyadh
Project Value: Confidential
Duration: 3 years

8 QRA for Ras Tanura Area

ARE were awarded by Saudi Aramco, to provide professional services pertaining to QRA Study for Ras Tanura Area. The objective of the project is to perform a detailed and comprehensive Quantitative Risk Assessment (QRA) of the hazards and risks associated with the operations of the downstream cross-country pipelines located at Ras Tanura Peninsula. The QRA is to be conducted to evaluate the ongoing safe operation of these pipelines, supporting the comprehensive Ras Tanura urban development, and the QRA will offer a comprehensive assessment, forming the safety zoning foundation for the update of the Ras Tanura urban master plan.

Saudi Arabia

Ras Tanura, KSA
2023 – 2024
Saudi ARAMCO
Project Value: Confidential
Duration: 6 months

9 Project Management Services – HOP-II Villa Construction Project

Saudi ARAMCO Total Refinery Co. Ltd. (SATORP) awarded “ARE” a ‘PMS’ contract to provide project management services during the construction of House Ownership Program – II, Villa Construction Project in their facility in Jubail. The works mainly to supervise the execution works by the construction contractor on site. The works include all disciplines viz. civil, architectural, landscaping, interior design, plumbing, sanitary, HVAC, FFS, FAS, electrical, etc.

Saudi Arabia

SATORP – Jubail
2023 – 2027
Saudi ARAMCO Total Refinery Co. Ltd., Jubail
Project Value: Open
Duration: 4 years

10 Assessment of Chimney#2 Concrete Works and Steel Flue in Yanbu I

Marafiq, Yanbu vide Expertise Contracting Co. Ltd. has appointed “ARE” to do a condition assessment of the Chimney#2 Concrete Works in Yanbu I. Works involved to provide services related to the assessment & recommendations after receiving the data from Expertise.  Expertise was responsible for performing all on site activities, including visual inspection, sampling & testing, etc.

Saudi Arabia

KSA-Yanbu
2022 – 23
Marafiq, Yanbu (Expertise)
Project Value: 240,000 SR
Duration: 2 months

11 Detailed Design & Cost Estimate for 4 SABGS Schools Renovation Projects (34 Schools modification of toilets, libraries, paging system, safety requirements)

This Scope of Work is to provide detailed design and cost estimate for the five (4) renovation works to be undertaken on thirty-four (34) Saudi Aramco Built Government Schools at various locations. The task includes developing the Detailed Design package for the renovation works for these schools. The work shall include renovation of Libraries at 10-Schools, Renovation of Toilets at 10-Schools, and Rectification works for Safety Concerns at 4 – E type schools, and Installation of Clock/ Paging Systems at 10 Schools. Works are not limited to the delivery of all project requirements but including site surveys, as-built drawings, engineering design package, SOW, construction specifications, material take-off’s, and ER quality cost estimate including material submittals review and technical queries resolutions.

Saudi Arabia

KSA-Dhahran
2023 – 24
Saudi ARAMCO
Project Value: 1,830,000 SR
Duration: 6 months

12 Various Projects of Ministry of Health in Hafar Al Batin, Site Supervision

The Directorate of Health Affairs in Hafar Al-Batin appointed “ARE” to provide services for the supervision of various projects in different towns/villages in the Hafar Al Batin region. The works mainly involve supervising whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, inspection of all activities on site, approval of materials, etc. The works also include all disciplines viz. civil, mechanical, piping, landscaping, plumbing, electrical utilities, architectural, etc.

Saudi Arabia

KSA-Hafar Al Batin
2023 – ongoing
Directorate of Health Affairs in Hafar Al-Batin
Project Value: SR. 4.3 Million
Duration: 24 months

13 Design for Expansion of Main Administrative Building of SIO, Al-Ahsa

ARE were awarded a contract by Saudi Irrigation Organization (SIO), for the provision of professional services relating to the ‘Design for Expansion of First floor in Main Administration Building of SIO, Hassa Governorate’. The consultancy services include detailed design of all disciplines including but not limited to architectural, interior design, electrical, HVAC, Plumbing, etc. As part of this project, a condition assessment of the ground floor of the existing building was found necessary in order to check whether the first floor can be constructed over the ground floor, without compromising its structural stability/safety.

Saudi Arabia

Hassa, KSA
2023 – ongoing
Saudi Irrigation Organization (SIO)
Project Value: 2,300,000 SR
Duration: 6 months

14 Traffic Survey for the PDH-PP Grass root Project at Yanbu Industrial City

The scope of services included Automatic Traffic Count (ATC) along the roads at their facility in Yanbu Industrial City. Classified Automatic Traffic Counts were conducted for each direction on the road between the existing facility and the proposed location for (PDH) Plant and (PP) complex. Counts were done for (7) consecutive days and for (24) hours. The survey report included the traffic data with the applied methodology and validation process.

Saudi Arabia

2023
Alujain National Industrial Company
Project Value: Confidential
Duration: 2 months

15 QRA Study for Use of Service Barge at NAGPD Tie-In Platforms

ARE were awarded by Saudi Aramco, to provide professional services pertaining to QRA Study for Use of Service Barges at NAGPD Tie-In Platforms. The QRA study will be carried out for using service barges next to NAGPD offshore tie-in platforms located in Arabiyah, Karan, Hasbah I/II/III Fields, as a replacement for the service vessels, and provide recommendations for mitigating the risk to as low as reasonably practicable level when the barge is located next to the tie-in platform.

Saudi Arabia

EP, KSA
2023
Saudi ARAMCO
Project Value: Confidential
Duration: 6 months

16 Supervision of Execution of Repair works in School Buildings in KSA, Framework Agreement

TBC entered into a framework agreement with “ARE” to do site supervision of rehabilitation works of various school buildings in KSA. The works mainly involve supervising whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, inspection of all activities on site, approval of materials, etc. The works also include all disciplines viz. civil, mechanical, piping, landscaping, plumbing, electrical utilities, architectural, etc.

Saudi Arabia

2023
TBC (Tatweer Building Company)
Project Value: OPEN
Duration: 12 months

17 Contract No. 02H-T14, Infrastructure Protection Consultation Studies in RIC

The Royal Commission for Jubail & Yanbu, Royal Commission in Jubail appointed “ARE” to carry out engineering and consultancy services for the corrosion management of all RC structures, systems and facilities in Ras Al Khair. This work included the evaluation of structures, testing and the preparation of complete tender packages for bidding purposes, as well as consultancy services for specialised studies and designs related to corrosion studies.

KSA - Ras Al Khair

2022 – ongoing
RC – Jubail & Yanbu
Project Value SR. 6,000,000
Duration: 5 Years

18 SAPD Cross Country Pipeline Corridors Quantitative Risk Assessment

The Saudi ARAMCO, appointed “ARE” to provide detailed Quantitative Risk Assessment (QRA) model and report for the execution of the southern area pipelines comprehensive study of the hazards/risks associated with the operations of the downstream cross-country pipelines located at the southern area of SA areas.

KSA – Southern Area

2022 – ongoing
Saudi Aramco
Project Value: 442,117 SR
Duration: 6 months

19 Condition Assessment of Piles of a Pipe Bridge in Arab Tank, Yanbu

The Arab Tank terminal Ltd. has appointed “ARE” to do a condition assessment of a Pipe Bridge in King Fahd Industrial Port (MYAS). Works involved documents review, visual inspection, sampling and field-testing, and assessment & recommendations (includes under water inspection of piles).

Yanbu, KSA

2021
Arab Tank Terminals Ltd.
Project Value: 212,750 SR
Duration: 1 month

20 BRA & QRA Studies for ERTD Facilities

The Saudi ARAMCO, appointed “ARE” to provide integrated Building Risk Assessment (BRA) and Quantitative Risk Assessment (QRA) study for Eastern Region Terminal Department’s (ERTD) Offshore Facilities. The ERTD facilities included in the study are the Juaymah Offshore Platform and Ras Tanura Sea Islands.

Juaymah and Ras Tanura, KSA

2021 – 2023
Saudi Aramco
Project Value: 911,940 SR
Duration: 12 months

21 Independent Risk Assessment Services

The Port Authority for Red Sea Gateway Terminal has awarded the Project to Alrabiah Consulting Engineers (ARE) to undertake an independent risk assessment of dangerous goods placement strategies, considering the existing, PA proposed and alternative strategies. The project scope incl., to identify hazards goods; Assess the current risk; provide comparative risk consideration, recommendations with respect to dangerous goods storage, to maintain risks As Low As is Reasonably Practicable (ALARP).

Jeddah, KSA

2021 – ongoing
Red Sea Gateway Terminal
Project Value: 159,100 SR
Duration: 4 months

22 Rehabilitation of the million reservoir in Makkah, Site supervision

SWCC appointed “ARE” to provide consulting and engineering services to supervise the Rehabilitation of the Million Reservoir in Makkah. It is worth to mention that “ARE” has also done the investigation & Assessment of this project that is now followed by the contractor under ARE Supervision. The works mainly involve checking whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc.

Makkah, KSA

2021-Ongoing
SWCC
Project Value: 3,898,960 SR
Duration: 36 months

23 Building Risk Assessment for Upgrade Sulfur Recovery Units – Yanbu Refinery Project

The Saudi ARAMCO, appointed “ARE” to provide BRA for upgrading the Sulfur recovery units at Yanbu Refinery project. The scope incl. how limiting point source SO2 emissions from 400 mg/Nm3 at the SAOC to 150 mg/Nm3 by installing Tail Gas Treating Units etc.; Update existing BRA model, base case, evaluate incremental risk, to new & existing buildings, update existing BRA Stage 3 report.

Yanbu, KSA

2021 – ongoing
Jacobs Zate,
Project Value: 253,780 SR
Duration: 1.5 months

24 NAOO Integrated RAM Study

The Saudi ARAMCO, appointed “ARE” to provide The Integrated Reliability, Availability and Maintainability (RAM) study is to be conducted in all NAOO processing facilities (GOSPs or TPs in case of NAG PD) along with development of an integrated RAM model of all NAOO facilities (incl. RTPD, SONPD, SOFPD, MPD, & NAGPD) covering all the products and offshore/onshore facilities.

Saudi Arabia (All Sectors)

2021 – ongoing
Saudi Aramco
Project Value: 6,657,500 SR
Duration: 24 months

25 HSE Firms / Partner for Generation Bl

The Saudi Electricity Company (SEC), appointed “ARE” to provide secondment of Health, Safety and Environmental (HSE) consultants. The proposed secondment is intended to support SEC’s efforts to enhance HSE and achieve its strategic objectives of excellence in HSE performance.

Saudi Arabia (All Sectors)

2021 – ongoing
Saudi Electricity Company (SEC)
Project Value: 14,469,000 SR
Duration: 6 months

26 Inspection and study of the concrete repair in cable trench – AK3, SWCC – Al Khobar

SWCC appointed “ARE” for the Inspection and study of the concrete repair in cable trench – AK3 in Al Khobar – KSA. Work scope incl. Inspection of the entire cable trench; to submit a detailed report on the current concrete situation; to submit a technical report on how to repair after studying the current situation, and developing technical plans; to submit SOW, BOQ for tender, etc. In addition, to provide cost estimate for repair works based on the approved SOW & BOQ.

Al Khobar, KSA

2021-2022
SWCC
Project Value: 299,000 SR
Duration: 1.5 months

27 Rehabilitation of Selected Concrete Structures in Shoaibah Plant, Site Supervision

SWCC appointed “ARE” to supervise the implementation of the civil works rehabilitation project at the desalination plant in Shoaibah. SOW incl. review tender documents & contract offer; advise comments on project documents; expertise supervision with close follow up with site activities and submit monthly progress report; to approve /reject/ reject with comments all RFI submitted by contractor, etc.

Shoaibah, KSA

2021-Ongoing
SWCC
Project Value: 2,392,000 SR
Duration: 36 months

28 Preparing technical studies and repair specifications for drinking water tanks and their accessories in the mixing stations of East Coast cities

SWCC appointed “ARE” to prepare technical studies and repair specifications of the structures which includes Foundations (ring beams) of Portable Water Tanks, Inspection Chambers, Security fence and Land Survey. The main coastal cities covered during project are: Safwa, Sihat, RasTannurah, Qatif, Dammam, Dhahran, and Khobar.

Eastern Province, KSA

2021-Ongoing
SWCC
Project Value: 1,132,750 SR
Duration: 6 months

29 Preparation of technical studies and repair specifications for the Riyadh-Qassim water transmission system and its accessories

SWCC, appointed “ARE” to prepare technical studies and repair specifications of the structures. Scope includes: concrete tanks for Riyadh Water System (used for Operational / storage / fire system); Drain Valve Chambers, etc. “ARE” has to prepare documentation which incl. Scope of Works; Tender Drawings; Bills of Quantities; Performance Specification for the monitoring scheme; and Specification for any addition rehabilitation or remedial works.

Riyadh, KSA

2021-Ongoing
SWCC
Project Value: 3,622,500 SR
Duration: 6 months

30 Inspection of Electrical Manholes in MYAS

“ARE” was appointed Marafiq, Yanbu to inspect about 3,000 electrical manholes in MYAS, Yanbu.

The work involved visual inspection, assess the existing condition based on the guidelines agreed with Marafiq and prepare inspection reports for each manhole

KSA -Yanbu

2020
Marafiq, Yanbu
Project Value: SR. ~2.3 M
Duration: 3 Years

31 Project Management Services for HOP and Community Buildings

Saudi ARAMCO Total Refinery Co. Ltd. (SATORP) awarded “ARE” a ‘PMS’ contract to provide project management services during the design & construction of House Ownership Program and Community Building in their facility in Jubail. The works mainly involve checking the performance of design documents by the design consultant, and supervise the execution works by the construction contractor on site. The project has a potential to form a team of more than twenty engineers including Project Manager, Contracts Manager, Building Management Specialist, Sr. Scheduler, Sr. Material Engineer, etc. The works also include all disciplines viz. civil, architectural, landscaping, interior design, plumbing, sanitary, HVAC, FFS, FAS, electrical, etc.

SATORP - Jubail

2020 – ongoing
Saudi ARAMCO Total Refinery Co. Ltd., Jubail
Project Value: Open
Duration: 3 years

32 Construction and Equipment of a Polyclinic Hospital with 250 beds in Central African Republic (CAR).

The Central African Republic has obtained funds from the Saudi Development Fund (SDF) to finance the Project. The project is construction and equipping of a 250-bed Polyclinic Hospital. The consultancy services include detailed design of all disciplines, and construction management/supervision.

Central African Republic

2020 – Ongoing
Ministry of Economy, Planning and Cooperation.
Project value: 2,975,000 Saudi riyals
Duration: 29 months

33 Construction and Equipment Project, University Hospital Center of ABOBO, Republic of Cote d’Ivoire.

The Ministry of Health and Public Hygiene at Cote d’Ivoire, represented by the Project Planning Unit of the Abobo University Hospital of the Project Management Unit Hospital (CEP/UPPH) has received funding from the Arab Bank for the Economic Development of Africa (BADEA) and the Saudi Development Fund (SDF). The project is the construction of ABOBO University Hospital Center. The consultancy services include detailed design of all disciplines, and construction management/supervision.

Abobo, Cote d'Ivoire

2020 – ongoing
The Ministry of Health and Public Hygiene
Project Value: 7,300,000 SR
Duration: 36 months

34 Project of Architectural & Technical Studies and Monitoring of Works for the Extension of the University of Bangui (Central African Republic)

The Central African Republic has obtained funds from the Saudi Fund for Development (SDF) to finance the project. The project is the construction of two (2) blocks capable of accommodating 600 students each, a new university residence and a boundary wall. The consultancy services include detailed design of all disciplines, and construction management/supervision

Central African Republic

2020 – ongoing
Ministry of Economy, Planning and Cooperation
Project Value: 3,000,000 SR
Duration: 23 months

35 Project of Architectural & Technical Studies and Monitoring of Works for the Rehabilitation of the Marie Jeanne CARON High School in Bangui (Central African Republic)

The Central African Republic with funds from the Saudi Development Fund (SDF) to finance the Project. The project is rehabilitation of two main buildings and their equipment to accommodate 3,000 students, and construction of a perimeter wall. The consultancy services include detailed design of all disciplines, and construction management/supervision.

Central African Republic

2020 – ongoing
Ministry of Economy, Planning and Cooperation
Project Value: 1,077,000 SR
Duration: 23 months

36 Civil Works Co. – Safety Management Systems Gap Analysis

Civil Works Co. is an infrastructure company carrying out much of their work for the Saudi Arabian Government. Main areas of their works include sewage and desalination with many work sites within the public road network. They would like to assess their Safety Management System (SMS) against current best practices such as:

  • ISO 45001:2018, Occupational Health and Safety Management Systems – Requirements with guidance for use
  • Saudi Aramco Safety Management System

CWC has appointed “ARE” to carry out their SMS assessment, and perform the gap analysis, which will identify areas of non-conformance, and finally recommend what needs to be developed and changed in it.

KSA - Dammam

2019
Civil Works Co.
Project Value: SR. 215,800
Duration: 2 months

37 Various Projects in Madinah Region, Site Supervision

The Ministry Environment, Water and Agriculture (MEWA) appointed “ARE” to provide project management services for the supervision of various projects in different towns/villages in the Madinah region including Khaibar Faqat, Oula, Mahad, Wadi Al Fara, Hanakiyah, Mandasah and Al Silsilah Bi Khaibar. The works mainly involve supervising whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The works also include all disciplines viz. civil, mechanical, piping, landscaping, plumbing, surveying, electrical utilities, etc.

KSA-Madinah Region

2019 – ongoing
Ministry Environment, Water and Agriculture
Project Value: SR. 13.1 Million
Duration: 36 months

38 RAM Study for Juaymah Terminal Shipping

The Saudi ARAMCO, appointed “ARE” to provide Reliability Availability and Maintainability (RAM) studies, and the model that reflects the overall production of the Eastern Region Terminal Operations Department (ERTOD) operating facilities as by the process flow function. The scope of work consisted the following.

  • Predict and assess the production availability of the facilities based on the (base case) configuration, and compare against the target availability;
  • Identify area of vulnerability from a reliability point of view, i.e. single point of failures and any areas where the predicted unavailability may affect production;
  • Identify and rank the equipment/ sub-systems, which are major contributors towards plant unavailability; and
  • Confirm the sparing, operating and maintenance philosophies adopted to meet the total availability of the system, and define remedial actions or potential design changes.
KSA - Juaymah

2019 – 2020
Saudi ARAMCO
Project Value: 215,000
Duration: 6 months

39 National Feed Company (FEEDCO), General Engineering Services

FEEDCO appointed “ARE” to provide general engineering services for the design and supervision of various facilities, infrastructure to be built in their facility in Dammam. The works involve development of the client’s conceptual design to working drawings, planning issues, and preparation of tender documents for construction. The works also included supervision of execution of various structures. All disciplines viz. civil, architectural, landscaping, plumbing, sanitary, HVAC, roads, FFS, FAS, electrical, etc. were included.

KSA - Dammam

2019 – ongoing
FEEDDO
Project Value: SR. Undefined
Duration: 36 months

40 Four Government Security Complexes, Kingdom Wide – Traffic Impact Study

Khateb & Alami has appointed “ARE” to carry out traffic study and its analysis on selected roads around the proposed project to provide Government Facilitis Security Forces with adequate facilities and proper environment.

The project comprises data collection by conducting source destination surveys, stated preference surveys, traffic counts & classification resulting in a database. The next stage involves the analysis of data collected for the proposed traffic movement if found necessary.

KSA - Harad, Hawtah, Safaniyah and Khurais

2019
Khateb & Alami
Project Value: SR. 252,000
Duration: 3 months

41 Investigation of Weigh Bridge Concrete Foundation in Luberef Jeddah Plant

Luberef appointed “ARE” to carry out investigation, detailed design check, assessment and recommendations, related to Engineering Study for Weigh Bridge Concrete Foundation located on the Eastern Coast of KSA.

ARE’s scope of services included a comprehensive condition survey, site sampling and laboratory testing, as well as the detailed rehabilitation design and the preparation of all tender documents, to restore the foundation under operation.

KSA - Jeddah

2018
Luberef, Jeddah
Project Value: SR. 99,000
Duration : 2 months

42 Contract No. 560-T41, Infrastructure Protection Studies in Industrial and Community Area

The Royal Commission for Jubail & Yanbu, Royal Commission in Jubail
appointed “ARE” to carry out engineering and consultancy services for the corrosion management of all Royal Commission Jubail Al-Sinaiyah structures, systems and facilities. This work included the evaluation of structures, testing and the preparation of complete tender packages for bidding purposes, as well as consultancy services for specialised studies and designs.

KSA - Jubail

2018 – ongoing
Royal Commission in Jubail
Project Value SR. 13,499,500.00

43 HAZOP in Various Saudi ARAMCO Facilities

The Saudi ARAMCO, appointed “ARE” to provide HAZOP studies by their East-West Pipeline Department. The scope of work consisted of providing a facilitator and technical secretary/scribe for the performance of the HAZOP/SIL. The scope also included preparation and report writing. The Proponent provided all relevant information to be used during the studies such as previous HAZOP and SIL Study reports, Safety Requirements Specifications SRS, Safety Instrumented Functions List, Cause and Effects diagrams/charts, MOC records, including reference drawings e.g. P&IDs, PFD etc.

The HAZOP/SIL workshops were also held at the VENDOR facilities in Saudi Arabia. The objective of the HAZID workshop was to develop a Hazard and Effects that can be used to demonstrate that all hazards and effects have been identified, are understood and are being properly controlled.

KSA - Abqaiq, Jizan, Abha

2018 – 2019
Saudi ARAMCO
Project Value: 253,000
Duration: 6 months

44 Condition Assessment of Strategic Water Reservoirs in Makkah

SWCC-Riyadh, appointed “ARE”, for the assessment of the Million and Jurranah reservoirs in Makkah region. The scope included investigation and assessment of the concrete structural elements, cable stayed roof and earthen dams. The work involved carrying analyses and simulation to examine if the detected seepage (if any) is within safe ranges and in controlled pattern, evaluation of the existing piezometers data and define the level of risk and at which piezometers level reservoir have to be emptied/filled, and at what piezometers rising rate at which the reservoirs have to be emptied. Also includes evaluation of the safety of reservoirs slopes and base from different aspects such as slope stability, allowable bearing capacity, seepage (leak), erosions aspects as well as other aspects; Hydraulic and geotechnical stability of the closure dam and abutments, etc. Works involved visual inspection, sampling and testing, and assessment & recommendations.

Based on the assessment, ARE shall produce a Remedial Works Package to be carried out by a specialist Contractor (s) including; Scope of Works; Tender Drawings; Bills of Quantities; Performance Specification for the monitoring scheme; and Specification for any addition rehabilitation or remedial works.

KSA - Makkah

2018 – 2019
SWCC – Riyadh
Project Value : SR. 2,150,000
Duration : 3 months

45 King Khaled Air Base in Khamis Mushyt and Prince Sultan Air Base in Kharj, Secondment of Staff

STANLEY Consultants appointed “ARE” to provide secondment services for the construction for Saudi F-15 Fleet Modernization Program, Munitions Storage Area in King Khaled Air Base in Khamis Mushyt Prince Sultan Air base in Kharj.

The works mainly involved checking whether the execution on site is undertaken as per the project contract documents. The activities include inspection of all activities on site, approval of materials, etc.

KSA-Kharj/Khamis Mushyt

2018 – 2019
STANLEY Consultants., – USA
Project Value: SR.532,000 Duration: 14 Months

46 Multi Cargo Storage Building in King Abdulaziz Port, Dammam

“ARE” were appointed for the supervision of the completion works for the Development of Multi Cargo Storage Building in King Abdulaziz Port, Dammam, Site Supervision.

The Consultant works mainly involve supervising whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc.

KSA - Dammam

2018 – ongoing
Saudi Customs, Riyadh
Project Value : ~ 1.18 Million
Duration : 18 months

47 Consultancy Services for Concrete Condition Survey of Structures

The Saudi Development & Reconstruction Program for Yemen appointed ARE to carry out investigation/assessment to determine the immediate requirements with the goal of operating this airport at the soonest possible time, taking into consideration the safety, security and functionality of the airport.

The Al-Ghayda Airport in Yemen was constructed in two phases. The first construction phase of the Terminal Building including runway, aprons and support buildings was constructed in 1984, and the second construction phase of the Terminal Building was done in 2000 -2001. Assessment for the Terminal Building and all associated buildings and airport infrastructure were carried out to ascertain their integrity including all related services associated within the buildings such as the architectural, civil, mechanical, and electrical and telecom requirements. ARE also prepared Remedial Works Package including; Scope of Works; Tender Drawings; Bills of Quantities; and Specifications.

Yemen - Ghaydah

2018
SDRPY, Riyadh
Project Value SR. 285,000.00

48 King Khaled Air Base in Khamis Mushyt and Prince Sultan Air Base in Kharj, Secondment of Staff

Michael Baker International appointed “ARE” to provide secondment services for the construction for Saudi F-15 Fleet Modernization Program, Munitions Storage Area in King Khaled Air Base in Khamis Mushyt Prince Sultan Air base in Kharj.

Michael Baker International appointed “ARE” to provide secondment services for the construction for Saudi F-15 Fleet Modernization Program, Munitions Storage Area in King Khaled Air Base in Khamis Mushyt Prince Sultan Air base in Kharj.

KSA-Kharj/Khamis Mushyt

2018 – 2019
Michael Baker Itl., – USA
Project Value: SR.1,428,000 Duration: 14 Months

49 HAZOP & QRA Study for SABIC Fire Training Centre Project

The Saudi ARAMCO, appointed “ARE” to provide HAZOP studies for SABIC Fire Training Centre project in Jubail, KSA. The scope of work consisted of mainly HAZOP & QRA Study for the relocation of LPG Storage Tanks and Fuel Storage Tanks as part of the SABIC Fire Training Centre Project (SFTC).

KSA - Jubail

2018
FAEC
Project Value: SR. 159,000
Duration: 3 months

50 Tamimi Market in Dhahran – Geometric Design

Tamimi Real Estate Div. Co. has appointed “ARE” to carry out study and provide geometric design for the roads around the proposed construction of Tamimi Super Market in Dhahran

The project comprises data collection, topographic survey and geometric design for the road segments around the proposed market.

KSA - Dammam

2018
Tamimi Real Estate Div. Co.
Project Value: SR. 60,000
Duration: 1 month

51 Study & Prep. of Ten Docs for Civil Works Rehab in Shoaibah Plant (Phase I)

“ARE” were appointed for the investigation and assessment of certain concrete structures at the Shoaiba Desalination Plant (Phase 1) including the Turbine Area, Boiler Area, Jetty Area, cable ducts, and other structures.

In addition to the above ARE have been requested to prepare the Detailed Design and Tender Package for the rehabilitation works.

KSA - Shoaiba

2017
Saline Water Conversion Corporation
Project Value SR. 654,000.00
Duration : 4 months

52 Tamimi Market in Dammam – Traffic Study

Tamimi Real Estate Div. Co. has appointed “ARE” to carry out traffic study and its analysis on selected roads around the proposed construction of Tamimi Super Market in Dammam.

The project comprises data collection by conducting source destination surveys, stated preference surveys, traffic counts & classification resulting in a database, which will be fully integrated into a GIS model of the region. The next stage involves the analysis of data collected for the proposed traffic movement if found necessary.

KSA - Dammam

2017
Tamimi Real Estate Div. Co.
Project Value: SR. 125,000
Duration: 2 months

53 Prince Sultan Air Base in Kharj, Secondment of Staff

Michael Baker International appointed “ARE” to provide secondment services for the construction of Prince Sultan Air base in Kharj.

The works mainly involved checking whether the execution on site is undertaken as per the project contract documents. The activities include inspection of all activities on site, approval of materials, etc.

KSA-Kharj

2017 – 2018
Michael Baker Itl., – USA
Project Value: SR. 2,400,000
Duration: 18 Months

54 Rehab Strip Mall in Dhahran – Traffic Impact Study

Al Argan Homes has appointed “ARE” to carry out traffic study and its analysis on selected roads around the proposed construction of Rehab Strip Mall Project in Dhahran.

The project comprises data collection by conducting source destination surveys, stated preference surveys, traffic counts & classification resulting in a database which will be fully integrated into a GIS model of the region. The next stage involves the analysis of data collected for the proposed traffic movement if found necessary .

KSA - Khobar

2017
Al Argan Homes
Project Value: SR. 87,000
Duration: 2 months

55 Rehabilitation of Selected Jetty Fenders, SAMREF – Yanbu

SAMREF, Yanbu appointed “ARE” to carry out an investigation related to the deterioration of selected fenders of the Suez Berths and Short Haul Berths in Yanbu. Apart from a condition survey, ARE’s scope of work included condition assessment, recommendations of appropriate remedial works, and prepare tender documents for suitable repair/replacement works.

KSA - Yanbu

2017
SAMREF, Yanbu
Project Value: SR. 449,000
Duration: 6 Months

56 Tilal Al Doha Strip Mall in Dhahran – Traffic Impact Study

Al Argan Homes has appointed “ARE” to carry out traffic study and its analysis on selected roads around the proposed construction of Tilal Al Doha Strip Mall Project in Dhahran.

The project comprises data collection by conducting source destination surveys, stated preference surveys, traffic counts & classification resulting in a database which will be fully integrated into a GIS model of the region. The next stage involves the analysis of data collected for the proposed traffic movement if found necessary .

KSA - Khobar

2017
SAMREF, Yanbu
Project Value: SR. 449,000
Duration: 6 Months

57 Study & Design of Storage Area in Khobar Plant

SWCC Khobar Plant appointed “ARE” to IFP design package for the warehouse building, to be built in Khobar.

The building comprised of various facilities for staff, administration, etc. The work involved site survey, site investigations, preparation of design drawings and complete tender package. The works included all disciplines viz. civil, architectural, landscaping, plumbing, sanitary, HVAC, FFS, FAS, electrical, etc.

KSA-Khobar

2017
SWCC Al Khobar
Project Value: SR. 298,500
Duration: 4 months

58 Condition Assessment of Strategic Water Tanks in Jeddah

SWCC-Riyadh, appointed “ARE” to carry out condition assessment of four strategic water tanks under construction in Jeddah. Works involved visual inspection, sampling and testing, and assessment & recommendations.

KSA - Jeddah

2017
SWCC – Riyadh
Project Value : SR. 649,000
Duration : 3 months

59 Seawater Pump House – Study for Assessment of Steel Structure of Bldg # 10

“ARE” was appointed Marafiq, Yanbu to investigate the existing PEB in SWPH, Yanbu. The elements inspected were steel columns, beams supporting crane rails, etc

The work involved visual inspection, structural design check of the beams supporting the rails, and dimensional survey. Calculations were carried out to assess the adequacy of the structure according to the international standards. The scope was mainly to check the original design and advice what structural strengthening measures are needed for the crane load to be increased from existing 35T to 40T. The scope also included preparation of tender documents for the necessary strengthening of the structure.

KSA -Yanbu

2017
Marafiq, Yanbu
Project Value: SR. 780,000
Duration: 6 Months

60 Construction Autism Center in Khobar

Fozan Al Fozan Co. appointed “ARE” to provide supervision services for the construction of Autism Center in Khobar.

The works mainly involved checking whether the execution on site is undertaken as per the project contract documents. The activities include inspection of all activities on site, approval of materials, etc. The project is being executed by a team of engineers including all disciplines viz. civil, architectural, mechanical, electrical, etc.

KSA-Khobar

2016 – 2018
Fozan Al Fozan, – Khobar
Project Value: SR. 650,000
Duration: 2 years

61 Somerset Downtown Hotel in Khobar – Traffic Study

AlMutlaq Real Estate Co. has appointed “ARE” to carry out traffic study and its analysis on selected roads around the proposed construction of Somerset Downtown Hotel in Khobar.

The project comprises data collection by conducting source destination surveys, stated preference surveys, traffic counts & classification resulting in a database which will be fully integrated into a GIS model of the region. The next stage involves the analysis of data collected for the proposed traffic movement if found necessary .

KSA - Khobar

2016
AlMutlaq Real Estate Co.
Project Value: SR. 145,000
Duration: 2 months

62 Wire Rod Straightening Shop, Hadeed – Assessment on Structural Integrity

“ARE” was appointed SABIC, Jubail to investigate the newly constructed PEB in Hadeed, Jubail. The elements inspected were steel columns, beams supporting crane rails, etc.

The work involved visual inspection, structural design check of the beams supporting the rails, and dimensional survey. Calculations were carried out to assess the adequacy of the structure according to the international standards. The scope was mainly to check the original design and advise of any deficiencies in the design. The scope also included preparation of tender documents for the necessary strengthening of the structure.

KSA -Jubail

2016
SABIC, Jubail
Project Value: SR. 495,000
Duration: 5 Months

63 AlFozan Autism Center

Al Fozan appointed “ARE” to prepare IFC design package for the construction of the Autism Center Building, in Khobar.

The building comprised of various facilities for staff, administration, children’s hostel facilities (boys & girls), halls, training facilities, etc. The work involved detailed design and preparation of IFC package to invite potential bidders for the construction of the facility. The works included all disciplines viz. civil, landscaping, plumbing, sanitary, HVAC, FFS, FAS, electrical, etc.

KSA-Khobar

2015
Fozan Al Fozan, Khobar
Project Value: SR. 1,700,000
Duration: 9 months

64 Construction Supervision of Boys & Girls School in Dammam

Knowledge Enrichment Co. appointed “ARE” to provide supervision services for the construction of a Boys & Girls School, in Dammam.

The works mainly involved checking whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The project is being executed by a team of engineers including all disciplines viz. civil, architectural, mechanical, electrical, etc.

KSA-Dammam

2015 – ongoing
Knowledge Enrichment Co. – Dammam
Project Value: SR. 3,350,000
Duration: 4 years

65 Study & Design of King Abdullah & Riyadh Road Intersection in Al-Hassa City

The Municipality of Al-Hassa appointed “ARE” to carry out the study and design of King Abdullah Road & Riyadh Road Intersection in Al-Hassa City. The Scope of Works involved design, topographic survey, geo-technical analysis, traffic study, study of geological properties, etc. works to be carried out.

KSA-Al-Hassa

2015
Municipality of Al-Hassa
Project Value: SR. 1,250,000
Duration: 9 Months

66 Structural Design Check of a PEB

“ARE” was appointed eTEC Arabia Co. Ltd. to investigate the newly constructed PEB in Hadeed, Jubail. The elements inspected were steel columns, beams supporting crane rails, etc.

The work involved visual inspection, structural design check of the beams supporting the rails, and dimensional survey. Calculations were carried out to assess the adequacy of the structure according to the international standards. The scope was mainly to check the original design and advise of any deficiencies in the design.

KSA -Jubail

2015
eTEC, Khobar
Project Value: SR. 345,000
Duration: 3 Months

67 Consultancy Services for Concrete Condition Survey of Structures in Jubail

The Marafiq, Jubail appointed “ARE” to carry out engineering and consultancy services for the concrete condition survey of civil structures for potable water, waste water and sea water facilities in Jubail. This work included the evaluation of structures, testing and the preparation of complete tender packages for bidding purposes, as well as consultancy services for specialised studies and designs.

The structures assessed during the study were waste water pumping stations, SWTP, IWTP, Pumping stations, Sea water channels, Sea water Return channel, etc.

KSA - Jubail

2015 – 2019
Marafiq, Jubail
Project Value SR. 5,850,000.00

68 Study & Design of Four Road Intersections in Al-Hassa City

The Municipality of Al-Hassa appointed “ARE” to carry out the study and design of five road intersections in Al-Hassa City. The Scope of Works involved design, topographic survey, geo-technical analysis, traffic study, study of geological properties, etc. works to be carried out.

KSA-Al-Hassa

2014 – 2015
Municipality of Al-Hassa
Project Value: SR. 5,250,000
Duration: 15 Months

69 Study & Design of Saudi Customs Administration Building in Jubail

Saudi Customs appointed “ARE” to IFP design package for the administration building, to be built in Jubail.

The building comprised of various facilities for staff, administration, etc. The work involved site survey, site investigations, preparation of design drawings and complete tender package. The works included all disciplines viz. civil, architectural, landscaping, interior design, plumbing, sanitary, HVAC, FFS, FAS, electrical, etc.

KSA-Riyadh

2014
Saudi Customs, Riyadh
Project Value: SR. 1,450,000
Duration: 5 months

70 Dammam Terminal Expansion Works in Dammam Sea Port, Site Supervision

“ARE” was invited to provide site supervision services for the supervision of the rehabilitation works of concrete pavements and wharves in the Dammam Sea Port. The works mainly involve checking whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The structures rehabilitated were the concrete pavements, rails, fascia beams, wharf slabs, pile caps, etc.

KSA -Dammam

2014
International Ports Services Co.
Project Value: SR. 1,280,000
Duration: 12 Months

71 Study & Design of Road Intersection in Najran City (Tunnel/Bridge at King Saud x 5th Street Intersection)

The Municipality of Al-Najran appointed “ARE” to carry out the study and design of road intersections at the junction of Tunnel/Bridge at King Saud x 5th Street Intersection in Najran City. The Scope of Works involved design, topographic survey, geo-technical analysis, traffic study, study of geological properties, etc. works to be carried out.

KSA-Al-Najran

2014
Najran Municipality
Project Value: SR. 995,000
Duration: 4 Months

72 Rehabilitation of Desalination Plant – Shuqaiq, Site Supervision

“ARE” was invited to provide site supervision services for the supervision of the rehabilitation works of selected concrete structures in the SWCC Shuqaiq Power & Desalination Plant. The works mainly involve checking whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The structures rehabilitated were the intakes, pump houses, power houses, perimeter fencing, etc.

KSA -Shuqaiq

2014 – 2019
Saline Water Conversion Corporation
Project Value: SR. 1,680,000
Duration: 60 Months

73 Condition Assessment of Old Scrap Steel Structure

“ARE” was appointed SABIC, Jubail to investigate the existing Old Scrap Steel Structure. The elements inspected were columns, beams supporting crane rails, rail and exposed foundation

The work involved visual inspection, dynamic assessment of the beams supporting the rails, and static alignment survey. Calculations were also carried out to assess the adequacy of the structure according to the DIN standards. Following the investigation we prepared a report giving recommendations on how to prolong the life of the structure. The scope also included preparation of tender documents for the rehabilitation/restoration of the structure for smooth operations

KSA -Jubail

2014
SABIC, Jubail
Project Value: SR. 615,000
Duration: 6 Months

74 Rehabilitation of Selected Jetty Piles and Pile Caps, SAMREF – Yanbu

SAMREF, Yanbu appointed “ARE” to carry out an investigation related to the deterioration of selected steel piles and reinforced concrete decking at the Suez Berths and Short Haul Berths in Yanbu. Apart from a condition survey, ARE’s scope of work included a professional durability study, the recommendations of appropriate remedial works.

KSA - Yanbu

2014
SAMREF, Yanbu
Project Value: SR. 451,000
Duration: 6 Months

75 Structural Assessment of Direct Reduction (A, B and C) Structures – HADEED Plant

“ARE” was appointed SABIC, Jubail to investigate the existing Direct Reduction Structures (A, B and C) in Hadeed Jubail. The elements inspected were columns, beams supporting crane rails, rail and exposed foundations.

The work involved visual inspection, dynamic assessment of the beams supporting the rails, and static alignment survey. Calculations were also carried out to assess the adequacy of the structure according to the DIN standards. During this calculations, installation of additional supports/loads on some structural elements of the structures were considered. Following the investigation we prepared a report giving recommendations on how to prolong the life of the structure. The scope also included preparation of tender documents for the strengthening/rehabilitation/restoration of the structure for smooth operations.

KSA - Jubail

2014
SABIC, Jubail
Project Value: SR. 3,215,000
Duration: 6 Months

76 Technical Support to Directorate of Planning & Surveying Works, Al-Hassa Municipality

The Municipality of Al-Hassa appointed “ARE” to provide technical support services for the supervision of various studies related to planning and surveying of various infrastructure facilities in Al-Hassa region. The works mainly involve assisting the municipality management in monitoring the study projects regarding road surveying, expropriation studies, town planning, etc.

KSA-Al-Hassa

2013
Municipality of Al-Hassa
Project Value: SR. 2,532,000 Million
Duration: 24 months

77 Investigation of Three Saudi Post Buildings (Phase 1)

“ARE” was invited to do the investigation, assessment and diagnosis for three three post office branches (Riyadh, Hafr Al Batin and Al Rass). The work involved visual inspection, document review, extensive sampling and testing, assessment and recommendations for restoration works. “ARE” after investigation prepared the recommendation report and also the tender documents for rehabilitation works. The project is being executed by a team of 14 engineers including Project Manager and engineers from all disciplines viz. civil, architectural, landscaping, plumbing, sanitary, HVAC, FFS, FAS, electrical, etc.

KSA -Riyadh

2013
Saudi Post, Riyadh
Project Value: SR. 1.7 Million
Duration: 6 months

78 Project Management Services for Business & Community Projects

The Khafji Joint Operations (KJO) appointed “ARE” to provide project management services for the supervision of the design and construction of various buildings, bridges, roads, facilities, infrastructure to be built in their facility in Khafji. The works mainly involve checking the performance of design documents by the design consultant, and supervise the execution works by the construction contractor on site. The project is being executed by a team of about 26 engineers including Project Manager, Project Controls Specialist, Contracts Manager, Building Management Specialist, Sr. Scheduler, Sr. Material Engineer, etc. The works also include all disciplines viz. civil, architectural, landscaping, interior design, plumbing, sanitary, HVAC, FFS, FAS, electrical, etc.

KJO - Khafji

2013 – 2018
Khafji Joint Operations, Khafji
Project Value: Open
Duration: 5 years

79 Technical Support to Directorate of Study & Design Works, Al-Hassa Municipality

The Municipality of Al-Hassa appointed “ARE” to provide technical support services for the supervision of various studies related to study and design of various infrastructure facilities in Al-Hassa region. The works mainly involve assisting the municipality management in monitoring the study projects regarding design of roads, design of buildings, expropriation studies, etc.

KSA-Al-Hassa

2013 – 2016
Municipality of Al-Hassa
Project Value: SR. 2,532,000
Duration: 24 months

80 Study & Analysis of Traffic Data for Selected Roads in Dammam

Dammam Municipality has appointed “ARE” to carry out traffic study and its analysis on selected roads in the Dammam Metropolitan Area with an aim to improve smooth flow of traffic in and around Dammam.

The project comprises data collection by conducting source destination surveys, stated preference surveys, traffic counts & classification resulting in a database which will be fully integrated into a GIS model of the region. The next stage involves the analysis of data collected for the development of Traffic Analysis Zones, Traffic Networks, and Travel Models; their analysis, rectification and automation. Finally, the developed models will be tested and an appraisal of the available alternatives will be performed culminating in the development of a preferred transportation system for the region

KSA - Dammam

2013 – 2016
Municipality of Dammam
Project Value: SR. 10,459,920
Duration: 3 years

81 Construction Supervision of SREDF Building in Hassa

The Saudi Real Estate Development Fund (SREDF) appointed “ARE” to provide construction management services for the supervision of their building in Hassa. The works mainly involve checking whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The project is being executed by a team of engineers including Project Manager and engineers from all disciplines viz. civil, architectural, mechanical, electrical, etc

KSA - Hassa

2013 – 2017
SREDF, Riyadh
Project Value: SR. 1,312,800
Duration: 4 years

82 Structural Evaluation of 18 Villas in SABIC Mega Housing Project, Jubail

“ARE” was invited to do the investigation, assessment and diagnosis for eighteen villas (7 conventional type and 11 pre-cast type construction) under construction in Jubail. The work involved visual inspection, document review, extensive sampling & testing including Ultrasonic Pulse Velocity measurements and extraction of cores, develop correlation between Ultrasonic Pulse Velocity readings and Core Compressive strength, estimation of core compressive strength, structural analysis, assessment and recommendations for restoration works. “ARE” after investigation prepared the recommendation report for rehabilitation works.

KSA-Jubail

2013
Beijing Construction Engineering Group
Project Value: SR. 976,600
Duration: 6 months

83 King Abdullah Project for Waad Al-Shamaal City Development, General Engineering Services

The Saudi Mining Co. (Ma’aden), appointed “ARE” to provide general engineering services for the comprehensive design of the various housing and infrastructure facilities including bridges, roads, facilities, infrastructure to be built in Ras Al-Khair. The works involve development of the client’s conceptual design to working drawings, planning issues, and preparation of tender documents for construction. The works also include all disciplines viz. civil, architectural, landscaping, interior design, plumbing, sanitary, HVAC, roads, FFS, FAS, electrical, etc.

KSA - Ras Al Khair

2013 – ongoing
Ma’aden
Project Value: Undefined
Duration: 6 years

84 QRS Study for Ethane Facility in Saudi ARAMCO, Safwa

The Saudi ARAMCO, appointed “ARE” to provide risk assessment studies for the Ethane Injection/ Reproduction Facility & JSDETH-1 Pipeline (the Project).
The objective of the HAZID workshop was to develop a Hazard and Effects that can be used to demonstrate that all hazards and effects have been identified, are understood and are being properly controlled.

KSA - Safwa

2013
Saudi ARAMCO
Project Value: 471,000
Duration: 4 months

85 Structural Evaluation of 395 Villas in SABIC Mega Housing Project, Jubail

“ARE” was invited to do the investigation, assessment and diagnosis for three hundred ninety five villas under construction in Jubail. The work involved visual inspection, document review, and identification of locations for Ultrasonic Pulse Velocity measurements, estimation of core compressive strength, structural analysis, assessment and recommendations for restoration works. “ARE” after investigation prepared the recommendation report for rehabilitation works.

KSA-Jubail

2013
Beijing Construction Engineering Group
Project Value: SR. 2,376,600
Duration: 9 months

86 IC Bldg 1010 Replacement

KAUST appointed “ARE” to IFP design package for the IC building 1010, to be built within the university premises

The building comprised of various facilities for staff, administration, etc. The work involved modification of the existing IFC design to IFP design package. The works included all disciplines viz. civil, architectural, landscaping, interior design, plumbing, sanitary, HVAC, FFS, FAS, electrical, etc.

KSA-Tuwal

2013
KAUST, Tuwal
Project Value: SR. 1,640,000
Duration: 6 months

87 Construction Supervision of Women’s Arts Faculty Building and Stadium in KFU, Hassa

King Faisal University appointed “ARE” to provide construction management services for the supervision of the construction of arts faculty building and stadium for women, in Hassa. The works mainly involve checking whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The project is being executed by a team of engineers including Project Manager and engineers from all disciplines viz. civil, architectural, mechanical, electrical, etc.

King Faisal University - Hassa

2013 – 2019
King Faisal University, Hassa
Project Value: SR. 10,512,000
Duration: 6 years

88 Study & Design of Road Intersection in Al-Hassa City (Dhahran x Madinah Munawwarah Road)

The Municipality of Al-Hassa appointed “ARE” to carry out the study and design of road intersections at the junction of Dhahran Road x Madinah Munawwarah Road in Al-Hassa City. The Scope of Works involved design, topographic survey, geo-technical analysis, traffic study, study of geological properties, etc. works to be carried out.

KSA-Al-Hassa

2013 – 2014
Municipality of Al-Hassa
Project Value: SR. 995,000
Duration: 4 Months

89 Yanbu 2 Power & Water Project Fuel Facilities, Detailed Design

Hanwha E & C appointed “ARE” to Detail Design of Facilities, incl., Prep. Of BOM/BOQ including the Study & Survey for Tie-in Location in ARAMCO & SAMREF Area and existing information (drawings, calculation, specification and etc.), and also Track/Monitor /Upgrade/Issue all engineering action lists, design review comments and HAZOP studies, etc.

KSA-Yanbu

2012
Hanwha Co. Ltd, Korea
Project Value: SR. 4.65 Million
Duration: 4 years

90 Ministry of Finance Buildings in Odaid, Detailed Design and Supervision

The Ministry of Finance appointed “ARE” to do the comprehensive design of the various different facilities to be built in Odaid area for the MOF staff.

The buildings comprised of various facilities for staff, administration, housing compound, office facilities, customs building, border checking facilities, security systems, etc. The work involved development of the client’s conceptual design to working drawings, planning issues, and preparation of tender documents for construction. “ARE” is also involved in tender assessment and also supervision of the structures that are being designed for execution.

KSA-Odaid

2012 – 2018
Ministry of Finance, Riyadh
Project Value: SR. 11.83 Million
Duration: 6 years

91 Rehabilitation of Saudi Post Head Office Buildings Dammam and Jeddah

“ARE” were appointed for the site supervision for the rehabilitation of Saudi Post H.O. buildings. The Consultant works mainly involve supervising whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The rehabilitation works were for both civil and mechanical utilities.

KSA - Dammam & Khobar

2012- 2013
Saudi Post, Riyadh Project Value SR. 1.62 Million
Duration : 1 year

92 Study & Design of Floor & Storm Water Drainage System in a Selected Regions in Riyadh

The Scope of Works involved

  • Surveying of different regions.
  • Establish an overview of the required data.
  • Collect available data.
  • Design Storm Water Networks.

The Scope of Works involved a study, design of storm water networks, topographic survey, geo-technical analysis, study of geological properties, etc.

KSA-Riyadh

2012
MOMRA, Riyadh
Project Value: SR. 10.4 Million
Duration: 24 months

93 Construction Supervision for the SWCC High Point Reservoirs in Riyadh

“ARE” were appointed for the supervision of the rehabilitation works of the reinforced concrete elements within the 2 high point reservoirs (R1C1, R1C2, R2C1 and R2C5) of size 725m x 325m and 7.5m depth, used for storing potable water prior to its transmission to Riyadh city.

The Consultant works mainly involve supervising whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc.

KSA - Riyadh

2012
Saline Water Conversion Corporation (SWCC)
Project Value : 2.4 Million
Duration : 34 months

94 Construction Supervision for the Najran Heritage Village in Janadriyah, Riyadh

“ARE” were appointed for the supervision of the construction of the Najran Heritage Village works in Janadriyah, Riyadh city.

The Consultant works mainly involved supervising whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc.

KSA - Riyadh

2012 – 2013
Arabian Fal Co.
Project Value : 0.65 Million
Duration : 7 months

95 Construction Supervision of Various Buildings in Taif University, Taif
KSA - Taif

2012
Taif University, Taif
Project Value: SR. 3,975,000
Duration: 3 year

96 Ministry of Finance Buildings in Khadra, Detailed Design and Supervision

The Ministry of Finance appointed “ARE” to do the comprehensive design of the various different facilities to be built in Khadra (Saudi – Yemen Border) area for the MOF staff. The buildings comprised of various facilities for staff, administration, housing compound, office facilities, customs building, border checking facilities, security systems, etc. The work involved development of the client’s conceptual design to working drawings, planning issues, and preparation of tender documents for construction. “ARE” is also involved in tender assessment and also supervision of the structures that are being designed for execution.

KSA - Khadra

2012 – ongoing
Ministry of Finance, Riyadh
Project Value: SR. 7,75 Million
Duration: 3 years

97 Construction Supervision for Upgrading of FFS/FAS System in KFIP, Yanbu

“ARE” was appointed to carry out the supervision of a comprehensive upgrading of the Fire Fighting system & Fire Alarm System in the King Fahd Industrial Port, Yanbu. The works mainly involve checking whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The project is being executed by a team of 4 engineers including Project Manager and engineers from disciplines viz. civil, mechanical and electrical.

KSA - Yanbu

2012
Saudi Ports Authority, Riyadh
Project Value: SR.1,313,000
Duration: 24 months

98 Environmental Consultancy for Joint Operations Projects

The Scope of Works involved to receive all existing information pertaining to the following:

  • Cartographic base of the area of influence of the project
  • Design documents and specifications of the project to being evaluated
  • Alternatives considered for the project, if any.
  • Former EIAs in the area of study, if any.
  • Climatological baseline, surveyor studies, hydro-geologic data, thematic maps and any other information considered relevant to the success of the project.
  • Local relevant legislation.

Based on information received and that raised in the field, the Consultant will describe all aspects of the environmental that may be affected by development: topographic map, Meteorological setting (Precipitation, temperatures, winds), Site settings, Tectonic setting and seismicity, geological and hydro-geological settings, landscape and biological environment (fauna and flora).

Additionally, the Consultant will describe current socio-economic conditions: Demographics, main population centers within the sector and its functionality, economic activities, employment, description of the network of basic services, description of the infrastructure, current use of land, legislation, management plans and socio-cultural aspects. Maps will be developed for each of the environmental variables characterized.

The job involved experts from our Associate Company, Techno-Consult (Venezuela).

Kuwait - Al-Wafra

2012
Joint Operations, Kuwait
Project Value: Undefined
Duration: 36 months

99 Contract # HQ071AGOC12 – General Engineering Services

The ARAMCO Gulf Operations Co. (AGOC), appointed “ARE” to provide general engineering services for the comprehensive design of the various buildings, bridges, roads, facilities, infrastructure to be built in Khafji. The works involve development of the client’s conceptual design to working drawings, planning issues, and preparation of tender documents for construction. The works also include all disciplines viz. civil, architectural, landscaping, interior design, plumbing, sanitary, HVAC, roads, FFS, FAS, electrical, etc.

KSA - Khafji

2012 – 2019
ARAMCO Gulf Operations Co. (AGOC), Khafji
Project Value: Undefined
Duration: 6 years

100 Construction Supervision of AlRuq’ee Border Exit Facilities, AlRuq’ee

The Ministry of Finance appointed “ARE” to provide project management services for the supervision of the construction of various buildings, roads, facilities, infrastructure to be built in Al-Ruq’ee Border Exist. The works mainly involve checking whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The project is being executed by a team of 66 engineers including Project Manager and engineers from all disciplines viz. civil, architectural, landscaping, plumbing, sanitary, HVAC, FFS, FAS, electrical, etc.

KSA - AlRuq’ee

2012 – 2018
Ministry of Finance, Riyadh
Project Value: SR. 50,665,000
Duration: 6 years

101 Military Industries Corporation (MIC-MoDA), Disposal of Asbestos Structures in Kharj, Site Supervision

The Military Industries Corporation – MoDA appointed “ARE” to provide site supervision services for the supervision of the removal of asbestos related materials from the military facilities in Kharj. The works mainly involved supervising whether the execution on site is undertaken as per the project contract documents, and following all safety norms regarding the HSE affects of Asbestos fibres, etc.. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc.

The works also involved establishment of onsite laboratory to check the atmospheric levels of asbestos fibres and perform all related tests pertaining to asbestos related materials. Asbestos specialists ACE Consultants from UK (“ARE”’s associated firm) were also involved in undertaking specialised works in this project.

KSA-Kharj

2012
Military Industries Corporation – MoDA
Project Value: SR. 2.8 Million
Duration: 18 months

102 Consultancy Services for Corrosion Control

The Royal Commission for Jubail & Yanbu, Royal Commission in Yanbu
appointed “ARE” to carry out engineering and consultancy services for the corrosion management of all Royal Commission Yanbu Al-Sinaiyah structures, systems and facilities. This work included the evaluation of structures, testing and the preparation of complete tender packages for bidding purposes, as well as consultancy services for specialised studies and designs.

The structures assessed during the study were Electrical substations, Water Tanks, Pump houses, Bridges, Culverts, Industrial College and Jetty.

KSA - Yanbu

2012 – ongoing
Royal Commission in Yanbu
Project Value SR. 10,330,000

103 Technical Support to Directorate of Traffic & Safety, Al-Hassa Municipality

The Municipality of Al-Hassa appointed “ARE” to provide technical support services for the supervision of various studies related to traffic and safety in Al-Hassa reagion. The works mainly involve assisting the municipality management in monitoring the study projects regarding traffic studies, traffic analysis, road planning, etc.

KSA-Al-Hassa

2012
Municipality of Al-Hassa
Project Value: SR. 2.6 Million
Duration: 24 months

104 Investigation of Selected Concrete Structures in Shuqaiq Power & Desalination Plant – Shuqaiq

“ARE” was invited to do the investigation, assessment and diagnosis for deteriorating concrete structures of certain concrete structures in Shuqaiq Power & Desalination Plant. The structures inspected were the intakes, pump houses and disconnection pit.

The work involved extensive sampling and testing. “ARE” after investigation prepared the recommendation report and also the tender documents for repairs of the structures.

KSA -Riyadh , KSA - Shuqaiq

2012 – 2013
Saline Water Conversion Corporation

105 Construction Supervision for Installation of Halon Gas System in KFIP, Yanbu

“ARE” was appointed to carry out the supervision of the installation of Halon Gas System in the King Fahd Industrial Port, Yanbu. The works mainly involve checking whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc.

KSA - Yanbu

2012
Saudi Ports Authority, Riyadh
Project Value: SR.352,000
Duration: 18 months

106 Military Industries Corporation (MIC-MoDA), Construction of Four (4) Industrial Buildings, Site Supervision

The Military Industries Corporation – MoDA appointed “ARE” to provide site supervision services for the supervision of the construction of four industrial buildings in their facility in Kharj. The works mainly involve checking whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc.

KSA-Kharj

2012
Military Industries Corporation – MoDA
Project Value: SR. 1.89 Million
Duration: 14 months

107 Rehabilitation of Concrete Structures in Jubail, AlKhobar and Shoaibah Power & Desalination Plants (Phases I & II)

“ARE” were appointed for the site supervision for the rehabilitation of selected reinforced concrete structures in the Plant and selected buildings of the housing compound. The works mainly involve supervising whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc.

KSA – Jubail, Khobar & Shoaibah

2011- 2013
Saline Water Conversion Corp. Project Value SR. 6.32 Million
Duration : 2 years

108 Construction of BSF Branch in Saudi ARAMCO Dhahran, Site Supervision

The Banque Saudi Fransi appointed “ARE” to provide Construction management services for the supervision of the Interior Design works planned within the BSF branch facility in Saudi ARAMCO Dhahran, North Park area. The works mainly involve supervising whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The works also include all disciplines viz. architectural, interior design, civil, mechanical, piping, plumbing, electrical utilities, etc.

KSA-Dhahran

2011
Banque Saudi Fransi
Project Value: SR. 396,540
Duration: 4 months

109 Study & Design of Road Intersection in Al-Hassa City (King Abdullah x Salahuddin Road)

The Municipality of Al-Hassa appointed “ARE” to carry out the study and design of road intersections at the junction of King Abdullah x Salahuddin Road in Al-Hassa City. The Scope of Works involved design, topographic survey, geo-technical analysis, traffic study, study of geological properties, etc. works to be carried out.

KSA-Al-Hassa

2011 – 2012
Municipality of Al-Hassa
Project Value: SR. 970,000
Duration: 6 Months

110 KAUST, General Engineering Services

King Abdullah University of Science & Technology appointed “ARE” to provide general engineering services for the design and supervision of various facilities, infrastructure to be built in Tuwal. The works involve development of the client’s conceptual design to working drawings, planning issues, and preparation of tender documents for construction. The works also included supervision of execution of various structures. All disciplines viz. civil, architectural, landscaping, interior design, plumbing, sanitary, HVAC, roads, FFS, FAS, electrical, etc. were included.

KSA - Tuwal

2011 – 2014
KAUST, Tuwal
Project Value: SR. 6,000,000
Duration: 36 months

111 Investigation of J2 Seawater Pump House Structure in Jeddah 2 Power Plant

“ARE” were appointed for the investigation and assessment of the seawater pump house (SWPH) structure in the power plant. The structure comprised an underground reinforced concrete reservoir, the roof slab of which provided the base for the steel superstructure housing the pumps.

KSA-Jeddah

2010
Saline Water Conversion Corporation (SWCC)
Project Value: SR. 225,000
Duration: 3 months

112 Execution of Ouakam Road, Dakar, Senegal, Site Supervision

The OIC National Agency/Saudi Development Fund appointed “ARE” to provide Construction management services for the supervision of the laying of Ouakam Road, Dakar. The works mainly involve checking whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The works also include all disciplines viz. civil, roads, surveying, etc.

Dakar, Senegal

2010
OIC National Agency/Saudi Development Fund
Project Value: SR. 4.7 Million
Duration: 24 months

113 Study of water resource management, public health, solid waste, ecological management, urban development, economy and data management for Al-Hassa

The Scope of Works involved Scoping Study in order to define the main objectives and in general to:

  • Establish an overview of the required data
  • Collect available data
  • Study available material
  • Conduct limited measurements as required

At the end of the above study it will be possible to know what additional surveys and studies are required for providing overview of the water resources, existing solid waste handling system, key ecosystem parameters, state of the public health, historical and present bio diversity, plans required for the urban development taking into account lo-cal conditions, significant socio-economic factors, agriculture, legislative issues, law enforcement and public participation.

A complete study will be carried out for the following aspects.

  • Solid waste Management
  • Public health (in relation to restaurants, food stores, barber shops and other establishments inspected by the municipality)
  • City cleanliness and evaluation of city cleaning contracts
  • Handling of sewage trucks
  • The job involved experts from our Associate Company, COWI (Denmark).

    KSA-Al-Hassa

    2010 – 2011
    Municipality of Al-Hassa
    Project Value: SR. 2.6 Million
    Duration: 12 months

    114 Construction of Pipe Lines for Irrigation Facilities and Storm Water Drainage Systems, Site Supervision

    The Ministry of Agriculture in Hassa appointed “ARE” to provide Construction management services for the supervision of the laying of pipe lines within the city of Hassa town (about 200 km North of Dammam). The works mainly involve supervising whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The works also include all disciplines viz. civil, mechanical, piping, plumbing, surveying, electrical utilities, etc.

    KSA-Hassa

    2010 – 2014
    Ministry of Agriculture
    Project Value: SR. 6.7 Million
    Duration: 36 months

    115 Study & Design of Storm Water Drainage System in a Selected Areas in Jeddah

    The Scope of Works involved

    • Surveying of different regions.
    • Establish an overview of the required data
    • Collect available data
    • Design Storm Water Networks

    The Scope of Works involved a study, design of storm water networks, topographic survey, geo-technical analysis, study of geological properties, etc.

    KSA-Jeddah

    2010 – 2011
    Jeddah Municipality
    Project Value: SR. 3.6 Million
    Duration: 12 months

    116 HADEED, Fire Damage in Furnace No. 2 – Investigation

    A fire broke out in the main steel plant near Furnace No. 2, causing extensive damage to the steel structural members in the vicinity of the fire. The furnace had to be shut down completely.

    “ARE” was invited to investigate the condition of the steel structural elements, immediately. In response, ARE mobilised the site investigation team and undertook a visual investigation, sampling and destructive and non-destructive testing of the steel columns, girders and concrete walls. ARE also undertook structural calculations to check the structural adequacy of the fire damaged structural elements, and the temporary structural strengthening works undertaken by HADEED. The initial recommendations for the remedial works were given within 12 hrs following the investigation, and the final recommendations were given after undertaking detailed calculations within a month after the site activities.

    KSA - Jubail

    2009
    SABIC
    Project Value: SR.340,000
    Duration: 3 months

    117 Construction Supervision of Faculty of Science (Lebanese Univ.) & Tripoli Wholesale Vegetable & Fruit Market

    The Council for Development and Reconstruction appointed “ARE” to provide project management services for the supervision of the construction of the above-mentioned facilities. The works mainly involve supervising whether the execution of work on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, regular meetings, inspection of all activities on site, approval of materials, etc. The works also include all disciplines viz. civil, architectural, landscaping, interior design, plumbing, sanitary, HVAC, roads, FFS, FAS, electrical, etc.

    Lebanon - Tripoli

    2009 – 2010
    Council for Development and Reconstruction
    Project Value: SR. 2,375,000
    Duration: 1 year

    118 Contract No. PID A-0062A, A/E and Consulting Services

    The Royal Commission for Jubail & Yanbu appointed “ARE” to provide project management services for the supervision of the construction of various buildings, bridges, roads, facilities, infrastructure to be built in Yanbu. The works mainly involve checking whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The project is being executed by a team of 35 engineers including Project Manager, Building Management Specialist, Sr. Scheduler, Sr. Material Engineer, etc. The works also include all disciplines viz. civil, architectural, landscaping, interior design, plumbing, sanitary, HVAC, FFS, FAS, electrical, etc.

    KSA - Yanbu

    2009 – 2013
    Royal Commission, Yanbu
    Project Value: SR. 33,975,000
    Duration: 3 years

    119 Study & Design of Road Four Intersections in Al-Hassa City (Al-Mubarraz Ring Road, King Abdullah & Makkah Street, King Fahd & Ain Al-Nejem Intersection, King Fahd Road & Northeast Village Intersection, and King Fahd & Al-Najah Intersection)

    The Municipality of Al-Hassa appointed “ARE” to carry out the study and design of road intersections at the junction of King Abdullah x Prince Mohammed Road in Al-Hassa City. The Scope of Works involved a study, design, topographic survey, geo-technical analysis, traffic study, study of geological properties, etc.

    KSA-Al-Hassa

    2009 – 2010
    Municipality of Al-Hassa
    Project Value: SR. 3,470,000
    Duration: 2 years

    120 Construction of Bridge/Tunnel at a Road Intersection in Al-Hassa City (King Abdullah x Prince Mohammed Road), Site Supervision

    The Municipality of Al-Hassa appointed “ARE” to provide project management services for the supervision of the construction of the above-mentioned facilities. The works mainly involve monitoring whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The works also include all disciplines viz. civil, architectural, landscaping, plumbing, and sanitary, roads, electrical utilities, etc.

    KSA-Al-Hassa

    2009 – 2012
    Municipality of Al-Hassa
    Project Value: SR. 3.6 Million
    Duration: 30 months

    121 Construction of Pipe Lines for Water Supply in the Regions of Al-Oula in Madinah Al-Munawwarah, Site Supervision

    The Ministry of Water & Electricity appointed “ARE” to provide Construction management services for the supervision of the laying of pipe lines from Al-Oula town (about 300 km North of Madinah Munawwarah) to various villages between Al-Oula & Madinah Munawwarah. The works mainly involve supervising whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The works also include all disciplines viz. civil, mechanical, piping, landscaping, plumbing, surveying, electrical utilities, etc.

    KSA-Madinah Munawwarah

    2009 – 2019
    Ministry of Water & Electricity
    Project Value: SR. 27.5 Million
    Duration: 120 months

    122 GDMW, Disposal of Asbestos Structures in Taif, Site Supervision

    The Ministry of Defence & Aviation, GDMW appointed “ARE” to provide site supervision services for the supervision of the removal of asbestos related materials from the military base in Taif. The works mainly involved supervising whether the execution on site is undertaken as per the project contract documents, and following all safety norms regarding the HSE affects of Asbestos fibres, etc.

    The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The works also involved establishment of on site laboratory to check the atmospheric levels of asbestos fibres and perform all related tests pertaining to asbestos related materials. Asbestos specialists ACE Consultants from UK (“ARE”’s associated firm) were also involved in undertaking specialised works in this project.

    KSA-Taif

    2009 – 2010
    General Directorate for Military Works
    Project Value: SR. 2.2 Million
    Duration: 12 months

    123 Repair of Abuhadriah/Hafer Al-Batem Roads, Site Supervision

    The Ministry of Transportation appointed “ARE” to provide Construction management services for the supervision of the repair of various roads between Abuhadriay & Hafer Al Baten. The works mainly involve supervising whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The works also include all disciplines viz. civil, surveying, etc.

    KSA-Abu-Hadriah

    2009 – 2013
    Ministry of Transportation
    Project Value: SR. 10.7 Million
    Duration: 48 months

    124 Investigation of Two Buildings – Dammam

    MOI appointed “ARE” to carry out investigation, detailed design check, structural analysis, assessment and recommendations, related to their ‘Emergency Forces Building’ and ‘Administration Building in Dammam in the Eastern Province, KSA

    Works involved visual inspection, sampling and testing, assessment & recommendations for the rehabilitation works to be carried out.

    KSA - Dammam

    2008
    Ministry of Interior,
    General Directorate for Civil Defence
    Project Value: SR. 183,000
    Duration:3 months

    125 Investigation of the Damage in Health Affairs Building

    The Ministry of Health appointed “ARE” to carry out the condition assessment of the Ground floor columns of the Health Affairs Building in Dammam.

    The Scope of Works involved a visual inspection, site sampling and testing, as well as the assessment & recommendations for the rehabilitation works to be carried out.

    KSA-Dammam

    2008
    Ministry of Health
    Project Value: SR. 68,000
    Duration: 1 month

    126 Investigation of Selected Buildings in RWTS-PS1, Jubail Plant

    SWCC appointed “ARE” to carry out investigation, detailed design check, assessment and recommendations, related to three selected buildings in SWCC Power & Desalination Plant, Jubail located on the Eastern Coast of KSA.

    Works involved investigating the buildings, comprising basement, ground floor and upper floors. ARE’s scope of services included a comprehensive condition survey, site sampling and laboratory testing, structural assessment of the structure, as well as the detailed rehabilitation design and the preparation of all tender documents.

    KSA - Jubail

    2008
    Saline Water Conversion Corporation (SWCC)
    Project Value: SR. 193,000
    Duration : 3 months

    127 Structural Assessment of Pipeline Culvert in Juaymah Gas Plant

    Hadi Al-Hammam Est. appointed “ARE” to carry out condition assessment, detailed design check, structural analysis, for the rating of the damaged Pipeline Culvert in Juaymah Gas Plant.

    Works involved structural analysis for the rating of the structure.

    KSA - Juaymah

    2008
    Saudi ARAMCO,
    Project Value: SR. 78,000
    Duration : 1 month

    128 Rehabilitation of Concrete Structures in Ummluj Desalination Plant

    “ARE” were appointed for the supervision of the rehabilitation of the reinforced concrete structures in SWCC Ummluj Desalination Plant located on the western seaboard of Saudi Arabia along the shores of the Red Sea.

    The works mainly involved monitoring whether the execution of works on site is undertaken as per the contract documents. The activities include preparation of monthly reports, regular meetings, inspection of all activities on site, approval of materials, etc.

    KSA – Red Sea Coast

    2008 – 2010
    Saline Water Conversion Corporation
    Project Value : 2,666,666.00
    Duration : 24 months

    129 Investigation of Discharge Channel at Ghazlan Power Plant

    “ARE” were appointed to carry out investigation of damaged embankment at the outfall of the discharge channel, and prepare contract documents for the remedial works contract.

    Works involved visual inspection, sampling and testing, assessment & recommendations of repair options, and preparation of tender documents.

    KSA - Ghazlan

    2008
    Saudi Electric Company,
    SEC – Eastern Province
    Project Value : 98,000.00
    Duration : 2 months

    130 Study & Design of Road Intersection in Al-Hassa City (King Abdullah x King Fahd Road)

    The Municipality of Al-Hassa appointed “ARE” to carry out the study and design of road intersections at the junction of King Abdullah x King Fahd Road in Al-Hassa City.

    The Scope of Works involved design, topographic survey, geo-technical analysis, traffic study, study of geological properties, etc. works to be carried out.

    KSA-Al-Hassa

    2008
    Municipality of Al-Hassa
    Project Value: SR. 435,000
    Duration: 6 Months

    131 Study & Design of Road Intersection in Al-Hassa City (King Abdullah x Prince Mohammed Road)

    The Municipality of Al-Hassa appointed “ARE” to carry out the study and design of road intersections at the junction of King Abdullah x Prince Mohammed Road in Al-Hassa City.

    The Scope of Works involved design, topographic survey, geo-technical analysis, traffic study, study of geological properties, etc. works to be carried out.

    KSA-Al-Hassa

    2008
    Municipality of Al-Hassa
    Project Value: SR. 370,000
    Duration: 6 Months

    132 Design and Supervision of Security System for Jizan Commercial Port

    Design and Supervision of Security System for Jizan Commercial Port
    “ARE” were appointed to carry out the study, and design of a comprehensive security system comprising fencing, gates, control systems, CCTV along fence & within the port, and intrusion detection system using optic fibre cables.

    KSA-Jizan

    2008
    Saudi Port Authority
    Project Value: SR. 996,000
    Duration: 6 months

    133 Pavement Maintenance Management Systems in Saudi ARAMCO

    The activities for this engineering pavement evaluation of ARAMCO facilities included review PMMS data collection procedures, manuals and guidelines provided by ARAMCO, perform all PMMS (Pavement Maintenance Management System), data collection, engineering associated work for the roads & areas, PMMS (Pavement Maintenance Management System) Distress Survey data collection work for the Facility Type Road & Areas Scope of work.

    ARE also provided engineering assistance in the form of either consultation or manpower supply to Roads Division engineers in the Asphalt Materials Specifications, Traffic Engineering, Design Packages Review, and Evaluation of New Paving Techniques. In addition, the works also involved the quality control measures that included, Soil testing, Aggregates testing, Asphalt testing, Slurry Seal and Asphalt Super pave testing.

    KSA - Dammam

    2008 – ongoing
    Saudi ARAMCO
    Project Value: No Limit
    Duration: 12 years

    134 Investigation of old AFIA Refineries and Administration Building in Jeddah

    “ARE” were appointed for the investigation and assessment of the two old refineries, administration building and 10 oil tank structure in their plant in Jeddah. The structures included both the steel structures and concrete structures. Works involved visual inspection, sampling & testing, assessment and provide suitable recommendations with the aim that the structures are safe under operation for another 5 years.

    KSA-Jeddah

    2007
    AFIA International Co.
    (AFIA)
    Project Value: SR. 185,000
    Duration: 3 months

    135 Design of Buildings in Arafat for Ministry of Interior

    The Ministry of Interior appointed “ARE” to do the comprehensive design of the various different facilities to be built in Arafat camp for the MOI staff.

    The buildings comprised of various facilities for staff, administration, mess, etc. The work involved development of the client’s conceptual design to working drawings, planning issues, and preparation of tender documents for construction.

    KSA-Various Locations

    2007 – 2008
    Ministry of Interior, Riyadh
    Project Value: SR. 470,000
    Duration: 3 months

    136 Study & Design Internal Ring Road in Al-Ahsa

    “ARE” has been appointed for the study and design of the internal ring road of the Al-Hofuf city with an aim to improve the traffic flow within and across the city. The study intends to study the existing roads and design a new internal ring road to enable the traffic to flow smoother.

    The study also includes traffic survey, topographic survey, design of roads, etc.

    KSA - Al-Hofuf

    2007 – 2008
    Al-Hassa Municipality
    Project Value: SR. 2,985,000
    Duration: 11 months

    137 Design of 04th Group of Buildings for Ministry of Interior

    The Ministry of Interior appointed “ARE” to do the comprehensive design of the various different buildings to be built in Riyadh, Tabuk, Hassa, Mina, Dammam and Jeddah. The buildings comprised of various facilities for staff, administration, housing, etc. The work involved development of the client’s conceptual design to working drawings, planning issues, and preparation of tender documents for construction.

    KSA-Various Locations

    2007 – 2009
    Ministry of Interior, Riyadh
    Project Value: SR. 9,880,000
    Duration: 2 years

    138 Design and Supervision of Security System for Yanbu Commercial Port

    “ARE” was appointed to carry out the study, design and supervision of a comprehensive security system comprising fencing, gates, control systems, CCTV along fence & within the port, intrusion detection system using optic fibre cables.

    KSA-Yanbu

    2007 – 2008
    Saudi Port Authority
    Project Value: SR. 898,000
    Duration: 1 year

    139 Investigation of General Cargo Berth in Sharma – Tabuk

    GDMW appointed “ARE” to carry out investigation, detailed design check, under water survey, structural analysis, assessment and recommendations, related to the ‘general cargo berth’ in Sharma on the Western Coast of KSA near Tabuk. Works involved visual inspection above and under water, sampling and testing, assessment & recommendations for the rehabilitation works to be carried out. Apart from concrete elements like piles, pile caps, deck slabs, etc. all M & E equipment were also included in the scope.

    KSA - Riyadh

    2007
    General Directorate for Military Works,
    GDMW
    Project Value: SR. 500,000
    Duration:4 months

    140 Site Supervision for Rehabilitation of North Bridge – KFIP, Yanbu

    “ARE” provided the site supervision services during the rehabilitation of North Bridge in the industrial port facilities in Yanbu. The various components of the project were pre-cast beams, piles, slab, etc. Activities included quantity surveying, inspection and full-time supervision.

    KSA - Yanbu

    2007- 2008
    Sea Ports Authority – King Fahd Industrial Port, Yanbu (KFIP)
    Contract Value SR. 288,000
    Duration : 12 Months

    141 Damage Assessment for the SWCC High Point Reservoirs in Riyadh

    “ARE” were appointed for the condition assessment of the reinforced concrete elements for 10 chambers within the 2 high point reservoirs (R1 & R2), each reservoir of size 725m x 325m and 7.5m depth, and used for storing water prior to its transmission to Riyadh.

    The settlement in the floor slab and cracking in the columns was to be investigated and recommendations had to be made for the rehabilitation works necessary to restore the structural integrity of the reservoirs.

    KSA - Riyadh

    2007- 2011
    SWCC – Riyadh.
    Project Value : 3,686,000
    Duration : 4 years

    142 Site Supervision for Renovation of Substations – KFIP, Yanbu

    “ARE” provided the site supervision services during the renovation of all the substations in the industrial port facilities in Yanbu. The various components of the project were HV substations, cable laying, construction of trenches, cable ducts, etc. Activities included quantity surveying, inspection and full-time supervision.

    KSA - Yanbu

    2007 – 2011
    Sea Ports Authority – King Fahd Industrial Port, Yanbu (KFIP)
    Contract Value SR. 440,000
    Duration : 36 Months

    143 Condition Assessment & Supervision of Rehabilitation Works of the Berths in Jubail Commercial Port

    Saudi Ports Authority – Jubail Commercial Port appointed “ARE” to carry out investigation, detailed design check, under water survey, structural analysis, assessment and recommendations, related to the ‘16 berths’ in Jubail Commercial Port on the Eastern Coast of KSA near Jubail. Works involved visual inspection above and under water, sampling and testing, assessment & recommendations for the rehabilitation works to be carried out. Apart from concrete elements like pre-cast cast in-situ blocks, deck slabs, etc. all M & E equipment were also included in the scope.

    KSA - Jubail

    2007
    Saudi Ports Authority – Jubail Commercial Port,
    Project Value: SR. 869,000
    Duration:4 months

    144 Design of 18th Floor of Admin Building, Security Gate and Workshop in Jeddah Islamic Port

    Saudi Ports Authority – Jeddah Islamic Port appointed “ARE” to carry out relevant studies, survey, structural analysis, and detailed design, related to the renovation of the 18th floor administration building, security gates and workshop in Jeddah Islamic Port on the Western Coast of KSA in Jeddah. Works involved data collection, detailed design and preparation of tender documents related to the Architectural, Interior Designing, Civil, Electrical, HVAC, Plumbing, Security System, etc. works.

    KSA - Jeddah

    2007
    Saudi Ports Authority – Jeddah Islamic Port,
    Project Value: SR. 695,000
    Duration:6 months

    145 Condition Assessment of Trestle Road Slab in Oil Port – SAMREF, Yanbu

    SAMREF appointed “ARE” to carry out condition assessment, detailed design check, structural analysis, for the rating of the damaged trestle road slab in the Oil Port of SAMREF, Yanbu. Works involved visual inspection, sampling & testing and structural analysis for the rating of the damaged trestle road.

    KSA - Yanbu 2007

    2007
    SAMREF,
    Project Value: SR. 168,000
    Duration : 1 month

    146 Contract # 027 – T11, General Engineering Services

    The Royal Commission for Jubail & Yanbu appointed “ARE” to provide general engineering services for the comprehensive design of the various buildings, bridges, roads, facilities, infrastructure to be built in Jubail. The works involve development of the client’s conceptual design to working drawings, planning issues, and preparation of tender documents for construction. The works also include all disciplines viz. civil, architectural, landscaping, interior design, plumbing, sanitary, HVAC, roads, FFS, FAS, electrical, etc.

    KSA - Jubail

    2007 – 2014
    Royal Commission, Jubail
    Project Value: SR. 12,975,000
    Duration: 66 months

    147 Structural Evaluation of Columns of Billet Bay Crane Gantry Columns

    “ARE” was appointed to design check the structural adequacy of the existing billet bay crane gantry columns against the increment of the loads on the beams.

    Calculations were carried out to assess the adequacy of the columns according to the ACI/DIN standards. Following the assessment a report giving recommendations was submitted to the Client.

    KSA - Jubail

    2007
    Saudi Iron & Steel Company, Hadeed
    Project Value: SR. 186,000
    Duration: 3 months

    148 Design & Supervision for Upgrading of FFS System in Jubail Commercial Port

    “ARE” was appointed to carry out the study, design and supervision of a comprehensive Fire Fighting system in the Jubail Commercial Port. The works involved investigation of the existing facilities, prepare design for up gradation and renovation of the existing FFS including preparation of tender documents, supervision of the execution of the up gradation works by the Contractor and supervision during the maintenance period also.

    KSA - Jubail

    2007
    Saudi Ports Authority, Jubail
    Project Value: SR. 1,872,000
    Duration: 24 months

    149 SWCC Shuqaiq (2), Water Transmission System

    “ARE” was appointed to supervise the laying of the pipelines from Shuqaiq Desalination plants to various small villages. The works mainly involve checking whether the execution on site is undertaken as per the contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc.

    KSA - Shuqaiq

    2007
    ILF, Riyadh
    Project Value: SR. 19,786,000
    Duration: 51 months

    150 Design & Supervision for Upgrading Sewage System in Jubail Commercial Port

    “ARE” were appointed to carry out the study, design and supervision of a comprehensive Sewage system in the Jubail Commercial Port. The works involved investigation of the existing facilities, and preparation of design for up gradation and renovation of the existing sewage system, including preparation of tender documents, supervision of the execution of the up gradation works by the Contractor, as well as the supervision during the maintenance period.

    KSA -Jubail

    2007
    Saudi Ports Authority, Jubail
    Project Value: SR. 1,877,000
    Duration: 24 months

    151 Evaluation of Delays and Penalties – Contract Administration

    “ARE” were appointed for assisting in the evaluation of claims, and acted as the Client’s representative in arbitration to conclude the disputed matters. The main aim was to evaluate the penalties on the delays occurred during the construction of a huge project here in KSA

    KSA – Riyadh

    2007 – 2008
    Saline Water Conversion Corporation (SWCC)
    Project Value : 980,000
    Duration : 9 months

    152 Investigation of Damage to Seawater Holding Basin in SAMREF Refinery

    “ARE” were appointed for the investigation and assessment of the reinforced concrete basin structure in the refinery.

    ARE has also prepared the Detailed Rehabilitation Design and Tender Documents for the above mentioned basin.

    KSA-Yanbu

    2006
    Saudi ARAMCO Mobil Refinery
    Project Value: SR. 148,000
    Duration: 3 months

    153 Dammam Comprehensive Transportation Study

    Dammam Municipality has appointed “ARE” to carry out a comprehensive transportation study of the Dammam Metropolitan Area comprising Dammam, Dhahran, Al-Khobar, Qatif and Ras Tanura with an aim to improve the transportation of individuals and goods in and around Dammam.

    The project comprises data collection by conducting source destination surveys, stated preference surveys, traffic counts & classification resulting in a database which will be fully integrated into a GIS model of the region. The next stage involves the analysis of data collected for the development of Traffic Analysis Zones, Traffic Networks, and Travel Models; their analysis, rectification and automation. Finally, the developed models will be tested and an appraisal of the available alternatives will be performed culminating in the development of a preferred transportation system for the region.

    KSA - Dammam

    2006 – 2010
    Municipality of Dammam
    Project Value: SR. 8,921,000
    Duration: 3.5 years

    154 Study & Design of Road Intersections in Al-Hassa City

    The Municipality of Al-Hassa appointed “ARE” to carry out the study and design of road intersections at the junction of King Abdullah Road and the Inner Ring Road in Al-Hassa City.

    The Scope of Works involved a study, design, topographic survey, geo-technical analysis, traffic study, study of geological properties, etc. works to be carried out.

    KSA-Al-Hassa

    2006
    Municipality of Al-Hassa
    Project Value: SR. 400,000
    Duration: 5 Months

    155 Design and Supervision of Security System for Jubail Commercial Port

    “ARE” was appointed to carry out the study, design and supervision of a comprehensive security system comprising fencing, gates, control systems, CCTV along fence & within the port, intrusion detection system using optic fibre cables.

    KSA-Jubail

    2006 – 2008
    Saudi Port Authority
    Project Value: SR. 983,000
    Duration: 2 years

    156 Development of Al-Hofuf City Historical Centre

    “ARE” has been appointed for the study, rehabilitation and development of Al-Hofuf city with an aim to develop it as a prominent tourist centre. The study intends to improve the infrastructure for tourists and its inhabitants, in accordance with the international standards pertaining to the restoration of historical city centres, giving prominence to the salient features of the city’s heritage and culture and protecting heritage sites and structures.

    The development will also encourage realtors in the area to improve their properties and attract investment, thereby creating employment opportunities, and also promote the tourism industry and various other economical and cultural activities in the region.

    KSA-Al-Hofuf

    2006 – 2007
    Al-Hassa Municipality
    Project Value: SR. 3,190,000
    Duration: 10 months

    157 Rehabilitation Works in the SDF Housing Complexes (Askan)

    “ARE” was appointed for the inspection and supervision of the rehabilitation works for the Saudi Development Fund owned Housing Complexes (a.k.a. Askan) in Dammam and Al-Khobar.

    The scope of work involved the continuous inspection of the structures to identify areas of deterioration and the rehabilitation design and supervision of repair works thereafter.

    KSA-Dammam, Al-Khobar

    2006 – 2007
    Saudi Development Fund (SDF)
    Project Value: SR. 632,000
    Duration: 12 months

    158 Investigation of J2 Seawater Pump House Structure in Marafiq Power Plant

    “ARE” were appointed for the investigation and assessment of the seawater pump house (SWPH) structure in the power plant. The structure comprised of an underground reinforced concrete reservoir, the roof slab of which provided the base for the steel superstructure housing the pumps. ARE has also been retained to prepare the Detailed Rehabilitation Design and Tender Documents for the above mentioned SWPH.

    KSA-Yanbu

    2006
    Saudi Power & Water Utility Co.
    (Marafiq)
    Project Value: SR. 174,000
    Duration: 3 months

    159 Investigation of the Damage in Berth # 2 of Yanbu Commercial Port

    The Saudi Ports Authority appointed “ARE” to carry out the investigation, assessment, recommendations, and detailed design check, under water survey, structural analysis, rehabilitation design, and tender documents for the restoration of the Pier # 2 of Yanbu Commercial Port. The Scope of Works involved a visual inspection above and under water, site sampling and testing, as well as the assessment of & recommendations for the rehabilitation works to be carried out.

    KSA-Yanbu

    2005
    Saudi Ports Authority
    Project Value: SR. 190,000
    Duration: 3 months

    160 Investigation of the Damage in Dammam Central Hospital

    The Ministry of Health appointed “ARE” to carry out the condition assessment of the Dammam Central Hospital, Old Building.

    The Scope of Works involved a visual inspection, site sampling and testing, as well as the assessment of & recommendations for the rehabilitation works to be carried out.

    KSA-Dammam

    2005
    Ministry of Health
    Project Value: SR. 90,000
    Duration: 1 month

    161 Study & Design of Onaiza Road

    The Ministry of Transportation appointed “ARE” to carry out the study and design of the Onaiza road, close to Gassim.

    The Scope of Works involved a study, design, topographic survey, geo-technical analysis, traffic study, study of geological properties, etc. works to be carried out.

    KSA-Gassim

    2005 – 2006
    Ministry of Transportation
    Project Value: SR. 890,000
    Duration: 6 Months

    162 Rehabilitation of Concrete Structures in Jubail Power and Desalination Plant (Phases I & II) and Housing Compound

    “ARE” were appointed for the site supervision for the rehabilitation of selected reinforced concrete structures in the Plant and selected buildings of the housing compound.

    KSA – Jubail

    2005 – 2009
    Saline Water Conversion Corp. Project Value SR. 3,676,000.00
    Duration : 3 years

    163 Study & Design of Jumoom – Zima Road

    The Ministry of Transportation appointed “ARE” to carry out the study and design of the roads between the two towns close to Makkah.

    The Scope of Works involved a study, design, topographic survey, geotechnical analysis, traffic study, study of geological properties, etc. works to be carried out

    KSA-Makkah-Jeddah

    2005 – 2006
    Ministry of Transportation
    Project Value: SR. 1,500,000
    Duration: 1 year

    164 Condition Assessment of Villas in Al-Nakheel Housing Compound

    “ARE” were appointed for the investigation and assessment of all the reinforced concrete buildings of the housing compound. The construction of these villas was stopped midway around 20 years back and since then they were exposed to an extreme environment. The deterioration of the reinforced concrete elements was investigated and remedial measures recommended to the Client. Detailed repair drawings and tender documents were also prepared.

    KSA - Dhahran

    2004
    King Fahd University of Petroleum and Minerals (KFUPM)
    Project Value SR. 98,000.00
    Duration : 2 months

    165 Restoration of Fire Protection System at Jeddah Islamic Port, Yanbu Industrial Port, Dammam Commercial Port and Dhuba Port

    “ARE” have been appointed by the Saudi Ports Authority to investigate and re-design all Electro-Mechanical installations pertaining to the Fire Protection Systems (FPS) comprising Fire Fighting Systems and Fire Alarm System at the Ports in Jeddah, Yanbu, Dhuba and Dammam. ARE also provided recommendations for rehabilitation of FPS with an estimated budget cost and all necessary drawings for the remedial/reinstatement works.

    KSA – Dhuba

    2004
    Saudi Ports Authority
    Project Value: SR. 1,200,000.00
    Duration : 12 months

    166 Redesign of Concrete Structures in Shoaibah Desalination Plant (Phase I)

    “ARE” were appointed for the investigation and assessment of certain concrete structures at the Shoaiba Desalination Plant (Phase 1) including the Turbine Area, Boiler Area, Chlorination Building, Tank- and Jetty Area, storm water- and collection channels, cable ducts, the evaporator slabs, and other works.

    In addition to the above ARE have been requested to prepare the Detailed Design and Tender Package and carry out the Site Supervision of the rehabilitation works.

    KSA - Shoaiba

    2003
    Saline Water Conversion Corporation
    Project Value SR. 2,059,200.00
    Duration : 24 months

    167 Rehabilitation of Concrete Structures in Eight Desalination Plants

    “ARE” were appointed for the investigation and assessment of reinforced concrete structures in eight SWCC Desalination Plants lying on the western seaboard of Saudi Arabia along the shores of the Red Sea at Al-Birk, Al-Wajh, Rabigh, Ummluj, Dhuba, Haql, Shuqaiq and Jeddah (Phases 2, 3 and 4).

    ARE have also prepared the Detailed Rehabilitation Design and Tender Documents for all the above mentioned Plants and have been appointed to carry out the Site Supervision of the rehabilitation works.

    KSA - Red Sea Coast

    2003 (Investigation)
    2005 – 2008 (supervision) Saline Water Conversion Corporation
    Project Value : 5,493,000.00
    Duration : 9 months + 2 years

    168 Investigation of Damaged Concrete Structures in Jubail Power and Desalination Plant (Phases I & II) and Housing Compound

    “ARE” were appointed for the investigation and assessment of all the reinforced concrete structures in the Plant and selected buildings of the housing compound.

    ARE has also prepared the Detailed Rehabilitation Design and Tender Documents for the above mentioned Plants. ARE was also appointed for the evaluation of tenders submitted by numerous contractors for the execution of the repair works.

    KSA - Jubail

    2003 – 2004
    Saline Water Conversion Corporation
    Project Value SR. 1,195,000.00
    Duration : 6 months

    169 Guideline Specifications/Drawings Update and Automation

    “ARE” have been appointed by the Directorate General of the Royal Commission for updating the existing specifications, engineering manuals, drawings and guideline details according to the current national and international standards in the disciplines of Civil Engineering, Mechanical Engineering, Electrical Engineering, Architecture and Material Engineering. This project also involves the automation of the existing documents with a view to make them more user-friendly.

    KSA – Jubail

    2003 – 2006
    Royal Commission for Jubail & Yanbu
    Project Value SR. 9,200,000.00
    Duration : 36 months

    170 Rehabilitation of Jetty Piles and Deck Slab

    SABIC Terminal Services appointed “ARE” to carry out an investigation related to the deterioration of the steel piles and reinforced concrete decking at the Chemical Berth No. 41 in Yanbu. Apart from a condition survey, ARE’s scope of work included a professional durability study, the recommendation of appropriate remedial works, and the provision of all necessary documentation for a contractor to tender for these works.

    KSA - Yanbu

    2002
    SABIC Terminal Services

    171 Investigation and Structural Assessment of Exchange Building

    The Saudi Telecom Company appointed “ARE” to investigate the TCC Exchange Building in Dammam City, comprising a basement, ground floor and four upper floors. ARE’s scope of services included a comprehensive condition survey, site sampling and laboratory testing, a structural assessment of the structure, as well as the detailed rehabilitation design and the preparation of all tender documents.

    KSA - Dammam

    2002
    Saudi Telecom Company

    172 Design of New College of Medicine – 3 Buildings

    King Faisal University appointed “ARE” to provide their professional design services for the College of Medicine at King Faisal University at Al-Ahssa.

    The project consists of three buildings, connected to each other by a covered and air-conditioned elevated bridge corridor. Two buildings, one for male and female students respectively, accommodate classrooms and offices, whereas the main building hosts laboratories, dissection rooms, a number of auditoriums and other services utilised by both male and female students.

    KSA - Al-Ahssa

    2002
    Ministry of Higher Education
    Project Duration : 5months

    173 Refurbishment of Al-Hayat Hotel at Yanbu

    KCREC appointed “ARE” to carry out the detailed investigation, condition assessment and recommendations for the rehabilitation of the four-star Al-Hayat Hotel. The scope of work includes the detailed design and preparation of the tender documents, the tender assessment, and the construction management and site supervision.

    KSA - Yanbu

    2001
    Al-Hayat Hotel – Yanbu, KCREC

    174 Investigation and Rehabilitation of King Fahd Naval Base

    The Royal Saudi Navy appointed “ARE” to carry out the investigation, assessment, recommendations, and detailed design check, under water survey, structural analysis, rehabilitation design, and tender documents for the restoration of the Ship Repair Facilities (SRF) at KFNB in Jeddah.

    The Scope of Works involved visual inspection above and under water, site sampling & testing, assessment of & recommendations for the rehabilitation works. Apart from concrete elements (piles, pile caps, beams, pre-stressed deck slabs, etc.), all utilities and M & E installations were included in the scope, as was the structural analysis of the piers and wharves, the design check for the Synchro Ship Lift.. The job involved experts from our Associate Company, COWI (Denmark) and Synchro Lift (USA).

    KSA - Jeddah

    2001
    Royal Saudi Naval Forces
    RSNF

    175 Redesign of Prince Abdullah Al-Faisal Stadium

    “ARE” were appointed by the General Presidency for Youth Welfare (GPYW) to provide their professional services with regard to the investigation of the Prince Abdullah Al-Faisal Stadium in Jeddah.

    The scope of work included the visual inspection, site sampling and testing for the different reinforced concrete frames and other structures in the stadium. This was followed by a detailed analysis, after which appropriate and cost-effective solutions for the necessary remedial works were formulated. The works also included the preparation of the Detailed Design and Tender Package for the above mentioned remedial works.

    KSA - Jeddah

    2001
    General Presidency of Youth Welfare
    GPYW

    176 Design and Supervision of De-watering System at Rakah Stadium

    GPYW appointed “ARE” to design and supervise the construction activities comprising the installation of a permanent groundwater collection system consisting of a network of drains, a pumping station, and a main pressure pipeline to the sea, where an outfall to discharge the water has to be provided.

    The Scope of Work includes the civil, structural, mechanical, electrical works, as well as some and remedial work activities.

    KSA - Dammam

    2001
    General Presidency of Youth Welfare
    GPYW

    177 Consulting Services for ARAMCO Gulf Oil Company

    AGOC appointed “ARE” to site-supervise the rehabilitation works of the South Jetty, the North Jetty and Causeway Bridge in the Khafji turning basin of the Company, including the review of rehabilitation proposals and day-to-day monitoring tasks.

    KSA - Khafji

    2001
    ARAMCO Gulf Oil Company (AGOC)

    178 Site Supervision for Al Fatha Sports Complex – Al Hassa

    “ARE” provided the site supervision services during the construction of a new sports complex in Al-Hassa.

    The various components of the project were youth hostel, sports hall, club house, gymnasium, swimming pool, football field with stadium and VIP enclosures, tennis courts, centralised air conditioning system, irrigations system, electrical sub-station, high mast flood lighting, ancillary building, asphalt roads, plumbing and sewerage system. Activities included quantity surveying, inspection and supervision

    KSA - Al-Hassa

    2001
    General Presidency for Youth Welfare (GPYW)
    Contract Value SR. 3,590,604
    Duration : 36 Month

    179 Investigation of Discharge Channel at Qurayyah Power Plant

    “ARE” were appointed to carry out investigation of deteriorated concrete structures in the Outfall Channels and prepare contract documents for the remedial works contract.

    Works involved visual inspection, sampling and testing, assessment & recommendations of repair options.

    KSA - Qurayyah

    2000
    Saudi Consolidated Electric Company, SCECO – Eastern Province

    180 Investigation of Shaybah Airport Runway

    Shaybah is located some 1000 Km south-east of Dammam, in the Empty Quarter of the Kingdom of Saudi Arabia. The site provides a base for a recently built Saudi Arabian Oil Company production plant, an administration and residential complex, a small Airport terminal building and airstrip. The runway is a rigid pavement Portland cement concrete slab with a single layer of WWF reinforcement.

    The works included, visual inspection, site sampling and laboratory testing including ‘Impact Echo Method’, ‘Demec Strain Gauge’, ‘Pull-Off’ tests’, Cores, test pits to collect samples of sub-base & sub-grade, and Petro-graphic analysis. The structural integrity of the runway was expressed as the runway’s ability to carry projected traffic.

    KSA - Shaybah

    2000
    Saudi ARAMCO

    181 Rehabilitation of Piers in KAANB in Jubail

    RSNF appointed “ARE” to carry out investigation, assessment, recommendations, detailed design check, under water survey, structural analysis, rehabilitation design, and tender documents for remedial works to be carried out on piers, wharves, ammo pier, floating pier, etc. at KAANB Jubail.

    Works involved visual inspection above and under water, sampling and testing, assessment & recommendations for the rehabilitation works to be carried out. Apart from concrete elements like all M & E equipment were also included in the scope. Structural analysis, design check for the syncro ship lift was also included. The job involved experts from our associate COWI (Denmark) and Syncro Lift (USA).

    KSA - Jubail

    2000
    Royal Saudi Naval Forces,
    RSNF

    182 Condition Assessment of Existing Structures, GOSI Buildings in Jeddah and Dammam

    GOSI appointed “ARE” to carry out condition assessment of their buildings in Jeddah and Dammam to identify the areas of distress/concern. Works involved review of documents, interviewing personnel and visual inspection.

    KSA - Jeddah and Dammam

    2000
    General Organisation for Social Insurance,
    GOSI

    183 Forensic Investigation into Roof Collapse at Cement Plant

    Cunningham Lindsey Middle East E.C. appointed “ARE” to carry out forensic investigation to determine the causes of the partial collapse of a 35m high RC silo roof.

    Works involved review of design and construction details, visual inspection, site measurement and observation, detailed structural analysis, assessment & recommendations for repairs to the structure.

    KSA - Rabigh

    2000
    Arabian Cement Company

    184 Structural Assessment of Additional Floors to the Existing Building

    “ARE” were appointed by Al-Mosbah Est. for the structural assessment of the building to carry 3 additional floors on top of the existing structure. Works involved review of original design and construction details, visual inspection, detailed assessment of additional loads, design of strengthening woks, tendering and construction management and site supervision.

    KSA - Jeddah

    2000
    Al – Mosbah Establishment

    185 Investigation of the Sea Water Intake Basin Structure

    Ibn Zahr appointed “ARE” for the investigation and appraisal of two sections of the slab covering the seawater intake basin at the MTBE complex.

    Works involved review of design and construction details, visual inspection, sampling & testing, diagnosis & recommendations for repairs to sections of slab.

    KSA - Jubail

    2000
    Saudi European Petrochemical Co.,
    Ibn Zahr

    186 Investigation of Selected Villas in Al-Khaleej Village Compound

    “ARE” COWI was appointed by SHARACO to provide professional services involving investigation, assessment & recommendations, and tender documents for selected villas in the Al-Khaleej Village Compound situated in Half Moon Bay. The villas are single and two storey structures, comprising pre-cast slabs, load bearing CMU walls and roof beams. The work involved detailed visual inspection, sampling and testing to determine the cause and extent of deterioration.

    KSA-Half Moon Bay, Al Khobar

    1999
    Saudi Hotels and Resort Areas Co.

    187 Al-Shoula Commercial Centre, Al-Khobar

    The Shoula Commercial centre experienced an extensive fire that resulted in serious damage. “ARE” COWI was appointed by HRH Prince Mish’al Bin Abdul Aziz Office in the Eastern Province to provide professional services involving the redevelopment and the preparation of the tender documents for the demolition of the centre’s existing superstructure.

    KSA-Al Khobar

    1999
    HRH Prince Mish’al Bin Abdul Aziz in the Eastern Province, Al-Khobar

    188 GOSI Commercial Building

    GOSI appointed “ARE” COWI to carry out detailed investigation, condition assessment and recommendations for their first commercial building in Dammam.

    The structure is a twelve storey building with basement, ground, mezzanine, service, restaurant floor and typical eight floors. It comprised typical columns, solid slabs at ground, mezzanine, service and restaurant floor, and waffle slabs at the others. The foundation structure comprised mat foundation.

    The work involved detailed visual inspection, sampling and testing to determine the cause and extent of deterioration and also the site supervision of the remedial works carried out to the structures.

    KSA-Dammam

    1999
    General Organisation for Social Insurance – GOSI

    189 Remedial Works for Seawater Structure of MTBE Plant

    Ibn Sina appointed “ARE” COWI to carry out investigation, assessment, recommendations for remedial works to be carried out on seawater structure of MTBE plant. Works involved visual inspection, sampling and testing, assessment & recommendations repairs of the structure.

    KSA - Jubail

    1999
    National Methanol Company,
    Ibn Sina

    190 Investigation of Various Sports Facilities in KSA

    SCOM appointed “ARE” COWI to carry out preliminary investigation, condition assessment and recommendations for various sports facilities in the Kingdom of Saudi Arabia. The structures comprised Stadiums, Club Buildings, Sports Halls, Administration Buildings, etc. The work involved general visual inspection, sampling and testing to determine the cause and extent of deterioration.

    KSA

    1999
    Saudi Company for Operations and Maintenance, SCOM

    191 Inspection of Fire Damaged Cable Tunnel and Control Building.

    A fire broke out in the main cable duct and control room basement supplying power from the substation to different areas of the plant, causing the plant to shutdown completely.

    “ARE” COWI was invited to investigate the condition of the concrete tunnel structure, immediately. In response ARE mobilised the site investigation team and undertook a visual investigation, sampling and non-destructive testing of the walls and roof of the tunnel. ARE recommended remedial works to be carried out which involved re-skinning using shotcrete. The initial recommendations for the remedial works were given within 8 hrs following the investigation and accordingly the repairs were done within 4 days.

    KSA -Jubail

    1998
    Saudi Iron and Steel Company, Hadeed

    192 Appraisal of Billet Bay Crane Gantry and Adjacent Structures

    “ARE” COWI was appointed to investigate the existing billet bay crane gantry, during the unscheduled shutdown period. The elements inspected were columns, beams supporting crane rails, rail and exposed foundation.

    The work involved visual inspection, dynamic assessment of the beams supporting the rails, die penetration testing of certain welds and static alignment survey. Calculations were also carried out to assess the adequacy of the structure according to the DIN standards. Following the investigation we prepared a report giving recommendations on how to prolong the life of the structure.

    KSA -Jubail

    1998
    Saudi Iron and Steel Company, Hadeed

    193 Rehabilitation of Seawater Distribution Structures

    SADAF appointed “ARE” COWI to carry out investigation, assessment, recommendations and preparation of contract documents for remedial works on certain seawater structures inside the plant. The structures comprised pump basins, dividing walls and supporting slabs. The work involved visual inspection, sampling and testing to determine the cause and extent of deterioration.

    In connection with the contract documents, “ARE” COWI prepared the complete tender package, including drawings, specifications, scope of work and bill of quantities. The work also involved extensive design of temporary supports and cofferdams. “ARE” in Association with COWI also performed the site supervision of the remedial works carried out to the structures.

    KSA-Jubail

    1998
    Saudi Petrochemical Company, SADAF

    194 Rehabilitation of Melt Shop Foundations

    During an unscheduled shutdown of the steel plant, HADEED appointed “ARE” COWI to investigate the condition of concrete foundations & supporting walls for the furnaces (approx. 700 tonnes) and continuous casters.

    The time frame given for investigation was only a week in order to carry out the remedial works during the shut down period. This required immediate response from the investigation team and good co-operation from the testing laboratory to arrive at our conclusions within the time frame. The investigation teams worked continuously for 24 hours to visually inspect the relevant areas and take samples.

    A complete tender package was issued by “ARE” COWI within the time frame, after which HADEED appointed a Contractor to carry out the remedial works, which involved re-skinning using hydro-jetting and using micro concrete to re-establish the concrete cover to all the relevant structures. The emergency situation required the contractor to work on site for 24 hours daily, during which “ARE” COWI was also involved in supervising the remedial works.

    KSA-Jubail

    1998
    Saudi Iron and Steel Company, Hadeed

    195 New Sales Office & Showroom in Riyadh

    GRUNDFOS appointed “ARE” COWI to do the comprehensive design of the new showroom to be built in Riyadh.

    The building comprised of showroom and offices with training facilities. The work involved development of the client’s conceptual design to working drawings, planning issues, tender and project management of the construction phase. ARE was also appointed by Grundfos to perform the supervision for the remedial works executed.

    KSA-Riyadh

    1998
    Grundfos

    196 Production of New Standard Concrete Specifications for SWCC Projects in Kingdom of Saudi Arabia.

    “ARE” COWI was appointed by SWCC to prepare standard concrete specifications to be used in all new SWCC projects in Saudi Arabia. An extensive survey of existing resources of materials was carried out, including ready mix plants to prepare the specification, which could be implemented with best possible results. The specifications were mainly based upon the study local conditions. Durability experts from COWI Denmark and Local expertise were involved in this project.

    KSA -Riyadh

    1997
    Saline Water Conversion Corporation

    197 Rehabilitation of Jeddah Desalination Plant

    “ARE” COWI was invited to do the investigation, assessment and diagnosis for deteriorating concrete structures of certain concrete structures in Jeddah Desalination Plant. The structures inspected were the intakes, cable trenches, pump houses, Chlorination building, roof slab and cable house basement. The work involved extensive sampling and testing. “ARE” COWI after investigation prepared the recommendation report and also the tender documents for repairs of the structures.

    “ARE” COWI also performed the site supervision of the remedial works carried out to the structures.

    KSA -Riyadh

    1997
    Saline Water Conversion Corporation

    198 Appraisal of Quay Walls in King Abdul Aziz Naval Base

    “ARE” COWI was invited to do the condition survey and monitoring of quay walls in the recently constructed pier. The scope was to measure the readings at monitoring gauges installed on the quay walls, periodically for five years, prepare annual reports briefing the existing conditions, and recommendations to carry out remedial works if found necessary. The work included under water inspection and divers were involved in this project.

    KSA - Jubail

    1997
    British Aerospace

    199 Rolls Royce Showroom

    “ARE” COWI was requested to assist with the planning concerns for New Signage and provide supervision services for fit-out of a new showroom. All the materials required were delivered from the UK via Jeddah Port and assembled by a local contractor at the site.

    KSA - Riyadh

    1997
    BWS

    200 Condition Assessment of New Road Bridge

    “ARE” COWI was appointed to carry out the condition survey of the control room pipe bridge in the plant. The site work involved visual inspection, sampling and testing. After site investigation “ARE” COWI prepared the report describing the existing condition of the bridge and recommending complete demolition & reconstruction of the deck and re-skinning of pier. “ARE” COWI was also requested to prepare detailed design including contract documents, drawings and bill of quantities to carry out remedial works.

    KSA - Jubail

    1997
    Saudi European Petrochemical Company

    201 Appraisal of Fire Damaged Glass Factory

    “ARE” COWI was invited to do the inspection and structural assessment on behalf of the insurers, to salvage parts of a 50,000 m2 factory building damaged by fire. The task involved extensive site investigation of structural steel and concrete elements. A large number of pull out tests were performed on this project.

    Following the inspections and investigations design of temporary supports, specifications for the wreckage removal procedures and supervision of the support works was carried out. Technical assistance was also given to the insurers for the reconstruction contract.

    KSA - Jeddah

    1996
    Cunnigham Scanrisk

    202 Rehabilitation Works to a Cooling Water Channel – SWCC

    “ARE” COWI was invited by Hitachi Zosen to assess the methods for making good casting defects and also give recommendations regarding use of protective coating systems for a concrete cooling water channel under construction. The work involved visual inspection and review of as-built documents. “ARE” COWI after inspection prepared a detailed method of statement for remedial works to be carried out.

    KSA - Khobar

    1996
    Hitachi Zosen

    203 Three Club Houses in Half Moon Bay

    Review of existing design and strengthening of roof beams and foundations was the main scope of this project. The work was mainly carried out by COWI Denmark. “ARE” COWI with assistance from COWI prepared the report describing the recommendations to carry out the strengthening works. The strengthening works were later also supervised by “ARE” COWI.

    KSA - Khobar

    1996
    Shams Tourism Enterprises Co.

    204 Investigation of Concrete Structures at Jubail Naval Stadium

    The project comprised the inspection of a large stadium comprising a three-storey structure including a large cantilever roof (~ 25 m wide), above the spectators arena. “ARE” COWI was invited to do the damage assessment of the stadium. The work involved investigation, assessment, and recommendations for concrete repair. “ARE” COWI then prepared the tender package to carry out the repair works. In addition, ARE also prepared a cost estimate where help was taken from BWS – Bahrain to complete the project in time.

    KSA - Jubail

    1996
    US Corps of Engineers, USA.

    205 Repair Works for Underground Water Tanks

    “ARE” COWI was appointed by Yuksel to do the investigation, assessment and diagnosis for cracks in underground water tanks under construction in Jubail. An extensive investigation including crack mapping and visual inspection was carried out.

    After investigations “ARE” COWI prepared the recommendation reports and the tender documents. “ARE” COWI was also asked to review the specifications for repair and coating of damaged structures.

    KSA -Jubail

    1995
    Yuksel Insaat Saudi Company

    206 Rehabilitation of Jetty

    “ARE” COWI was appointed by SWCC to do the investigation, assessment and diagnosis for deteriorating concrete structures at 20,000 TDW tanker jetty in Shoaiba.

    An extensive investigation and site sampling and testing were carried out. Under water inspection of the piles was also carried out, where divers were also involved. After investigations, ARE prepared the recommendation reports and the tender documents and was later also invited to do the supervision of repair works to the piles.

    KSA -Riyadh

    1995
    Saline Water Conversion Corporation

    207 Investigation of Settlements in New Multi-Storey Building in Makkah

    “ARE” COWI was invited to do the field inspection and report on behalf of the insurers, to assess the likely causes of settlements occurring in a 12-storey building under construction in Makkah. “ARE” COWI also did assess the settlement records and check the structural design of the tower. The work involved geo-technical experts from COWI Denmark.

    KSA - Makkah

    1995
    Cunnigham Scanrisk

    208 TV Tower in Qurayat

    “ARE” COWI was invited to provide professional services to analyse the cause for the collapse of TV tower and provide detailed and professional documentation concerning the repairs and remedial works to the buildings and tower foundations.

    KSA- Qurayyat

    1994
    Toplis and Harding S. A.

    209 Concrete Specifications and Quality Assurance

    “ARE” COWI was invited to review the consultant’s concrete specifications, assess the contractor’s site performance and quality assurance for new pier at the Royal Saudi Naval Base in Jubail.

    KSA -Jubail

    1994
    British Aerospace

    210 Rehabilitation of Desalination Plant – Assir

    “ARE” COWI was invited to do the investigation, assessment and diagnosis for deteriorating concrete structures of certain concrete structures in Assir Desalination Plant. The structures inspected were the intakes, pump houses and disconnection pit.

    The work involved extensive sampling and testing. “ARE” COWI after investigation prepared the recommendation report and also the tender documents for repairs of the structures. “ARE” COWI also performed the site supervision of the remedial works carried out to the structures.

    KSA -Riyadh KSA - Shuqaiq

    1994
    Saline Water Conversion Corporation

    211 Rehabilitation of Desalination Plant – Al-Khobar

    “ARE” COWI was invited to do the investigation, assessment and diagnosis for deteriorating concrete structures of certain concrete structures in Al-Khobar Desalination Plant.

    The structures inspected were the intakes, collection basins, pump houses, Chlorination building, sea walls, Gantry Crane, siphon basins and channels. The work involved extensive sampling and testing. “ARE” COWI after investigation prepared the recommendation report and also the tender documents for repairs of the structures.

    KSA -Riyadh

    1994
    Saline Water Conversion Corporation

    212 Construction of Tunnel at a Road Intersection in Al-Hassa City (King Abdullah x King Fahd Road), Site Supervision

    The Municipality of Al-Hassa appointed “ARE” to provide project management services for the supervision of the construction of the above-mentioned facilities. The works mainly involve monitoring whether the execution on site is undertaken as per the project contract documents. The activities include preparation of monthly reports, conduct regular meetings, inspection of all activities on site, approval of materials, etc. The works also include all disciplines viz. civil, architectural, landscaping, plumbing, sanitary, roads, electrical utilities, etc.