“ARE” were appointed for the investigation and assessment of certain concrete structures at the Shoaiba Desalination Plant (Phase 1) including the Turbine Area, Boiler Area, Jetty Area, cable ducts, and other structures.
In addition to the above ARE have been requested to prepare the Detailed Design and Tender Package for the rehabilitation works.
