Risk Analysis and Contract Administration
::
ARP is associated
with Systech International who has advised upon a broad range of
international contracts covering civil engineering,
building, power, process, petro-chemical, offshore and
shipbuilding work.
The Alrabiah-Systech association is of
benefit to our clients as we can investigate live projects
and provide an independent report upon performance, cost and
time overruns and consequential risks. We can advise them of
the correct contractual/legal position and provide a
positive strategy to resolve the problem.
In today's ever increasing commercial
environment, it is important that parties involved in any
contract administer this to its full potential, in order to
maximise their contractual entitlements. We frequently
assist by ensuring that such notices, reports, documentation
and correspondence are properly initiated and maintained
throughout the duration of the project.
|
 |
|
|
|
|
Arbitration and Claims Preparation
::
Dr. Abdulrahman Alrabiah is the chairman
of the Saudi Arbitration Committee and has memberships of
the following international arbitration institutions:
-
London Court of
International Arbitration (LCIA)
-
UNCITRAL
-
GCC Commercial Arbitration
Centre
-
International Court of
Arbitration – International Chamber of Commerce
ARP have experience both legally and
technically to either prepare, appraise or defend claims for
extensions of time, prolongation costs, disruption costs,
acceleration costs or recovery of disputed variations.
ARP provide our clients with powerful and
experienced teams that combine the three crucial elements
necessary for the proper analysis of claims, namely legal,
time and financial aspects. ARP could
also provide services as
conciliator, mediator, and member of a dispute review
board or adjudicator.
|
|
|
 |
Value Engineering and Project Cost
Analyses
::
ARP provides
specialised consulting services pertaining to the value
engineering of civil, commercial and other works which tend
to be one-time capital projects. Maximum benefits can be
achieved by applying it in an early design stage as
feasible. Changes or redirection of design can be
accomplished without extensive redesigning, large
implementation cost or schedule impacts.
Typically, for large projects, value
engineering studies are conducted during the schematic stage
and at the design development stage. The
improvement can be measured in terms of monetary aspects
and/or other critical factors such as productivity, quality,
time, energy, environmental impact and durability.
|
|
|
|
|
Safety
Management and Service Life Study
::
ARP can appraise the durability of structures while
they are still on the drawing board. The cost of significant
improvement at this stage will often be very modest compared
to the resulting savings in later maintenance costs.
The classic
elements in the design of durable concrete or steel include
sound materials, adequate protective measures against
aggressive environment and sound structural design practice.
Theoretical models based on these elements allow predictions
to be made for the degradation of the different elements of
the structure and a desired design lifetime may be achieved
by adjusting the relevant parameters accordingly.
Construction in a hot climate presents particular
difficulties, and a well-considered design may be ruined by
construction errors or inadequate workmanship on the
construction site. It is possible to reduce the risk of
mishaps and to improve the workmanship by ensuring that the
works are properly planned, monitored, and documented as
part of a proper Quality Assurance Program.
ARP offers
its assistance in reviewing the Quality Control Program and
monitoring the subsequent QC activities during construction.
ARP also
provides specialist advice on specific problems within
Civil, Electrical or Mechanical works. |
 |
|
|
|
|
|